Turn on the electricity of 400KVA Substation

Turn on the electricity of 400KVA Substation at Xuyen A industrial park, My Hanh Bac Commune, Duc Hoa District, Long An Province

On June 26, 2021 at 3:00 PM, Quang Anh completed the process of closing and operating the 400+400KVA substation and handed over the project.

Details on the turnkey construction project of the 22KV power line and 400KVA substation, and 600m of low-voltage cables to the workshops and factories of the Xuyen A industrial park, Rubber Company in My Hanh Bac Commune, Duc Hoa District, Long An Province.

Project name: XDM 22KV power line and 400KVA substation for the PV Rubber Plant. Location: Lot LB2, KCN Xuyen A, My Hanh Bac Commune, Duc Hoa District, Long An Province. Voltage level: 22KV Purpose: Rubber production

The 400KVA power substation provided electricity to the PV Rubber Company’s factory at Xuyen A industrial park, My Hanh Bac Commune, Duc Hoa District, Long An Province. The project was carried out within a total time of 30 days from May 27, 2021 to June 26, 2021.

400kva substation

The preparation of materials and document implementation took 26 days, and the actual construction took 4 days. Specifically: the construction commenced on May 27, 2021, equipment installation for medium and low voltage was installed on May 28, 2021, the Thibidi 400KVA transformer was received and installed on June 18, 2021, and the project was tested and handed over on June 26, 2021.

Working on turn on the electricity day: June 26, 2021

400kva substation

Cutting 03 LBFCO branch ends

Received 03 medium voltage transformers from the power company, proceeded to remove the 03 old transformers from the existing station and replaced them with 03 new ones.

Completed connection of the (400+400)KVA power station.

Full testing of the substation.

On June 26, 2021 at 3:00 PM, the power station (400+400)KVA was put into operation and the project was handed over to the CDT.

400kva substation

Are you in need of a reliable and efficient transformer subtation for your business? Look no further than Quanganhcons!

Our team of experienced professionals specializes in the construction of transformer stations, including our 400kVA transformer subtation. We provide end-to-end solutions for our clients, from the preparation of materials to the installation and testing of equipment.

With a proven track record of successful projects, we have the expertise to complete your transformer station project within a reasonable timeframe and budget. Our team takes great care to ensure that each project is tailored to meet the specific needs and requirements of our clients.

At Quanganhcons, we use only the highest quality materials and equipment, and our team stays up-to-date with the latest industry standards and regulations to ensure the safety and efficiency of our transformer stations.

Contact us today to learn more about how our 400kVA transformer subtation can benefit your business, and let us help you power your success!

QUANG ANH CE CO.,LTD

Office:Unit 02, 08th floor, Pearl Plaza Building, 561A Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City, Vietnam

Hotline: 0919758191

Email: sales@quanganhcgte.com

Website: quanganhcgte.com –  Youtube channel: Xây Lắp Điện Quang Anh 

Tax code: 0316365712

400kva substation

QUANGANHCONS

Substation budget estimate

Select the capacity, route lengths and package to view your indicative budget and electrical parameters.

01   Quick estimate

Cable and power-factor correction conditions
Request a project quotation

Send your project details, BOQ or drawings to request a formal quotation. Fields marked * are required.

Reference quick estimate
No quick estimate yet. You can still submit a project quotation request.

Quotation scope

Applies to one EVN-supplied substation with oil-immersed transformers at 22/0.4 kV (single-phase: 12.7/0.23 kV), with MV metering VTs/CTs supplied by EVN. The estimate includes the selected equipment, installation, earthing, transformer-to-main-breaker connections, design and connection documentation, and coordination of testing and utility acceptance.

Kiosk, integrated steel-pole and indoor substations include MV switchgear and the entered underground cable route. Other outdoor arrangements use the relevant protection configuration. The final diagram must meet the project connection requirements.

Excludes VAT, cables from the substation switchboard to the MSB/loads, live-line work, harmonic reactors, weak-ground treatment or special piling, land and special fire-protection provisions. Underground routes assume normal construction conditions and exclude road drilling and special reinstatement.

Prices are indicative investment budgets. A formal quotation follows site assessment and agreement on the configuration. Electrical selections are preliminary and require design verification before installation.

Capacity range and application conditions

The catalogue defines the enquiry range of this tool, not universal TCVN capacity limits. Single pole-mounted transformers: 15–100 kVA; three-unit banks: 3×15–3×100 kVA. Platform substations: 100–630 kVA. Steel-pole substations: 100–630 kVA; 750/800 kVA require design verification and local approval. Ground-mounted, kiosk and indoor configurations: 50–10,000 kVA. Not every configuration has a package price or the same structural design.

Reference: EVN Decision 1299/QD-EVN dated 3 November 2017, Volume 1, sections 3.3–3.4. Check the current requirements of the responsible utility before implementation. Kiosks must meet manufacturer ratings and testing requirements (IEC 62271-202); indoor and ground-mounted arrangements must meet project layout, ventilation, structural and fire-protection requirements. For multiple transformers, specify the quantity and capacity of each unit.

Developed by QuangAnhcons · © 2026 QuangAnhcons. Code licensed under GPL-2.0-or-later. Standards and manufacturer data belong to their respective owners.