QUANGANHCONS · SOLAR ENERGY · FACTORIES & COMMERCIAL BUILDINGS

Industrial Solar Rooftop EPC in Vietnam

Turn roof space and daytime demand into an investable solar project.

Project typesIndustrial roofs, commercial buildings, carports and defined ground-mounted electrical packages
Design boundaryPV DC circuits, inverters, AC distribution and the agreed point of connection
First decisionSize the system against demand, usable space and connection limits

What this service covers

QuangAnhcons provides solar electrical engineering, procurement and construction services for factories, warehouses and commercial facilities in Vietnam. Start with electricity consumption and usable roof area, compare a preliminary configuration, then confirm structural suitability, connection conditions and a project-specific bill of quantities.

Discuss your project in English with our team. Our priority delivery area is Southern Vietnam; project location, access and mobilization are confirmed during quotation.

A defined scope from design to handover

Feasibility and system design

Review bills and interval demand, shading, roof drawings, access, inverter locations and electrical capacity. Compare self-consumption, export-limited and storage-ready options against the actual operating pattern.

Procurement and construction

Agree module and inverter specifications, mounting design, cable schedules, protective devices, monitoring and installation methods. Coordinate structural and fire-safety work with the responsible specialists.

Grid and factory integration

Define the point of common coupling, metering, export control, transformer loading, protection interfaces and shutdown windows. Coordinate connection submissions where included in the contract.

Commissioning and handover

Inspect and test the installed system, demonstrate monitoring and alarms, document the as-built arrangement and train the operating team. Record outstanding items before acceptance.

Engineering decisions that shape your project

Capacity: separate kWp DC from kW AC

PV capacity in kWp is the sum of module nameplate ratings under standard test conditions. Inverter kW AC is the conversion capacity. Their ratio affects clipping and inverter utilization; it is not a fixed rule for every roof. Usable area must exclude access corridors, roof edges, skylights, equipment and shaded zones.

Energy and savings: use a transparent model

Annual energy can be screened as E = P_DC × Y_specific. In an illustrative case, 500 kWp × 1,400 kWh/kWp/year = 700,000 kWh/year. At an assumed 85% self-consumption ratio, 595,000 kWh/year offsets purchased electricity. These are assumptions, not a site yield forecast. Use a location-specific model and interval demand before an investment decision.

Returns: distinguish avoided purchases from export revenue

Calculate avoided electricity cost using the applicable time-of-use periods and the energy actually consumed on site. Deduct maintenance, replacement provisions and other operating costs. Evaluate export revenue only where the project has a confirmed legal and commercial route. Simple payback is capital cost divided by annual net savings; it does not replace a discounted cash-flow analysis.

Roof, protection and operational interfaces

Check remaining roof life, structural loads, wind uplift, corrosion, safe access and waterproofing before fixing the array. Electrical design checks include temperature-corrected string voltage, inverter operating limits, cable ampacity and voltage drop, isolation, bonding, surge protection and anti-islanding. Ordinary grid-connected PV does not provide outage backup without the required storage, controls and electrical separation.

What belongs in the bill of quantities

Typical BOQ structure — final quantities follow the agreed design. Swipe horizontally on a narrow screen.
Work or material group Measurement basis What the offer should define
PV modules Module / kWp DC Selected rating, quantity, layout and product warranty
Inverters and AC connection Unit / set AC rating, operating limits, protection and monitoring
Mounting and roof interfaces Set / m² / structural quantities Approved roof-specific design; strengthening separated
DC and AC cabling m / termination / circuit Measured routes, installation method, supports and losses
Protection, earthing and monitoring Set / point Isolation, SPDs, metering, export control and communications
Installation and commissioning Work package Access equipment, tests, handover and agreed shutdowns
Price depends on access, roof condition, mounting loads, equipment specification, cable lengths, distribution upgrades and connection scope. Roof strengthening, major civil work, fire-safety modifications, export arrangements, taxes and battery storage must be individually identified. A price per kWp without these boundaries is not a complete EPC comparison.

From your brief to acceptance

  1. Submit roof drawings, location, electricity bills and operating hours.
  2. Review feasibility and compare capacity and connection options.
  3. Verify the roof, electrical installation and access constraints on site.
  4. Approve design, equipment, BOQ, exclusions and construction programme.
  5. Install, inspect and complete the agreed electrical and monitoring tests.
  6. Accept the system, receive operating documents and begin the warranty period.

Documents you should receive

  • Design basis, array layout and single-line diagram
  • Module/string schedule, inverter schedule and cable calculations
  • Itemized BOQ with supply, installation and optional works separated
  • Inspection and commissioning records with equipment identification
  • As-built drawings, monitoring access and operating instructions
  • Warranty schedule separating installation obligations from manufacturer terms

The quotation identifies included documents, review cycles, approvals, acceptance criteria, exclusions and warranty obligations.

Frequently asked questions

Can I obtain an initial estimate before a site survey?

Yes. Roof drawings, location, bills, connection information and an equipment brief can support a budget estimate. Structural suitability, actual routes and connection conditions remain subject to verification before a firm construction offer.

Does the solar calculator issue a final construction quotation?

No. It is a planning aid. Its capacity, energy, cost and schedule outputs depend on entered assumptions and available price data. The final offer follows engineering review and an agreed BOQ.

Can a battery be added later?

Potentially. Check inverter compatibility, AC/DC coupling, space, protection, communications and the operating objective at the initial design stage. Storage readiness does not mean every inverter can accept any battery.

What warranty applies?

Installation works can be quoted with a 12-month defects warranty from contractual acceptance. Module, inverter and battery manufacturer warranties are separate; their exclusions, labour coverage and claim process must be stated in the offer.

Technical reference framework

Relevant engineering references are selected for the contracted equipment and installation. Applicable Vietnamese requirements, local network conditions, manufacturer instructions and the agreed design basis determine project compliance; listing a standard is not a certification claim.

    YOUR PROJECT · A CLEAR NEXT STEP

    Send the information needed for a useful quotation

    Start with the drawings and data you already have. We can identify what can be priced now and which points require verification.

    • Site location and building use
    • 12 months of electricity bills; interval load data if available
    • Roof area, roof type, age and structural drawings
    • Transformer capacity, single-line diagram and proposed connection point
    • Operating days, daytime demand and any export restriction
    • Target completion date and whether backup/storage is required

    Contact QuangAnhcons

    +84 919 758 191
    sales@quanganhcgte.com

    The email button opens your mail app with a service-specific brief. Attach drawings or share a viewable document link before sending.

    PRODUCT CONFIGURATIONS & ENGLISH PDF ESTIMATES

    Explore solar system sizes and download the reference documents

    Compare the published configurations, engineering assumptions and preliminary estimates below. Each product page includes its English PDF and supporting technical information. These are pre-survey references, subject to the site survey, load profile, roof structure, connection conditions and agreed EPC scope.

    Battery capacity and backup capability must be checked for the selected configuration. For industrial systems, confirm the LV/MV connection and excluded works before using a reference estimate as a project budget.

    QUANGANHCONS · Electrical construction and energy integration in Vietnam.
    View all services · Content reviewed 18 October 2026.
    EXPLORE YOUR OPTIONS

    Solar & storage planning tool

    Use the planner below to compare an initial configuration. Review all assumptions, excluded works and price qualifications before using the result for a budget. Contact details are not needed to explore the calculation.

    Solar project estimate

    Main equipment

    PV modules
    Inverters

    Project scope

    Grid connection and substation
    Battery energy storage (optional)

    Capacity is rounded to whole modules/cabinets. Backup defaults: SOC 90% to 10%, SOH 90%, discharge efficiency 95%, power derating 10%. Adjust these assumptions through the assistant when data is available. Backup is priced separately; compatibility and transfer time remain unverified.

    Owner-supplied equipment and site works
    Have technical measurements?
    EPC permitting and grid connection
    Site irradiation and energy yield A confirmed pin is used for PVGIS. A selected region can supply an estimate when point data is unavailable.
    Scope and budget basis

    Preliminary quantities and rates follow the entered configuration and require survey/design confirmation. Basic scope includes standard rails, clamps and module attachments on a suitable existing structure. Select raised frames, foundations, reinforcement, storage or a new transformer to price additions.

    Roof height is measured from ground; rack clearance is separate, above the roof/ground surface. Area and row pitch are layout estimates, not approved drawings or wind, structural, waterproofing or fire assessments. VAT follows the quote configuration and requires contract/invoice confirmation.

    Project location

    Choose a result or pin the roof to estimate energy. PVGIS receives rounded coordinates and array orientation.

    Project map
    Hoàng Sa, Trường Sa là của Việt NamSelect an address, click the map or drag the pin to the roof. The location is optional for an estimate.
    Open larger map

      Project locations are rounded. Distances are approximate straight-line distances.Global Energy Monitor · CC BY 4.0 · Natural Earth