QUANGANHCONS | INDUSTRIAL EPC ENGINEERING
Industrial rooftop PV 3 MWp: equipment and EPC reference
A structured technical reference for factories evaluating rooftop PV, site electrical interfaces and EPC budgets.
QAC-SOL-EST-20261109-1A3E9D63 · QAC Solar 8.21.0
1. Applications and self-consumption
This preliminary self-consumption PV system is intended for a multi-building industrial campus requiring a sectionalised electrical architecture. The final installed capacity must reflect roof area, measured hourly load, shutdown periods, PCC restrictions and site electrical infrastructure; the title capacity is not a guarantee of design output.
2. Equipment nameplate and electrical configuration
| DC | 3,000.32 kWp |
|---|---|
| AC | 2,625 kW |
| LONGi | 4,688 × 640 Wp |
3. Engineering calculations
Assuming a reference 640 Wp module for mathematical illustration only: Nmodules = ceil(3000 × 1,000 / 640) = 4688 modules; installed DC capacity = 4688 × 640 / 1,000 = 3000.32 kWp DC. Module and inverter models, MPPT limits, string counts and the DC/AC ratio require dedicated engineering verification.
4. Roof, protection and grid interface
This preliminary self-consumption PV system is intended for a multi-building industrial campus requiring a sectionalised electrical architecture. The final installed capacity must reflect roof area, measured hourly load, shutdown periods, PCC restrictions and site electrical infrastructure; the title capacity is not a guarantee of design output.
5. Programme and acceptance
Build a work breakdown structure for site survey, electrical and structural design, approvals, procurement, roof works, DC/AC installation, relay/protection testing, commissioning and handover. Review IEC 62548-1, IEC 60364-7-712 or the applicable Vietnamese standards, current electrical and fire regulations, utility requirements, and manufacturer instructions for each actual project.
Indicative WBS/Gantt (no fixed dates)
6. 3 MWp Solar estimate — view and download
Quote reference: QAC-SOL-EST-20261109-1A3E9D63 · QAC Solar 8.21.0 · Pre-survey reference
Before VAT: 36,003,840,000 đ · Illustrative VAT 10%: 3,600,384,000 đ · With VAT: 39,604,224,000 đ
Open PDF separately if mobile preview is blocked.
Preview matching source-locked PDF below. This is a preliminary budget; unit prices can be rounded and the actual utility/MV scope requires independent verification.
7. 12-month production and a representative 24-hour day
Example only, not surveyed production or measured load: PVGIS 5.3/ERA5 2023 HCMC (10.8231,106.6297), 10° south-facing, PVGIS loss 14% once, AC limits applied per configuration. Hypothetical factory operates Mon–Sat: 75% AC daytime load, 50% lunch, 35% evening, 18% overnight/Sundays; zero export assumed.

| Month | PV kWh | Self-use kWh | Curtailed kWh | Load kWh |
|---|---|---|---|---|
| 1 | 311,954 | 276,823 | 35,131 | 788,340 |
| 2 | 361,142 | 314,376 | 46,766 | 720,720 |
| 3 | 420,998 | 369,154 | 51,845 | 805,140 |
| 4 | 381,321 | 332,784 | 48,537 | 760,200 |
| 5 | 353,470 | 324,910 | 28,560 | 805,140 |
| 6 | 307,293 | 282,092 | 25,201 | 777,000 |
| 7 | 288,537 | 266,213 | 22,324 | 788,340 |
| 8 | 357,984 | 324,260 | 33,724 | 805,140 |
| 9 | 291,047 | 271,027 | 20,020 | 777,000 |
| 10 | 320,746 | 287,746 | 33,000 | 788,340 |
| 11 | 315,775 | 282,491 | 33,285 | 777,000 |
| 12 | 345,256 | 309,927 | 35,329 | 788,340 |
Representative day: 15 Mar 2023

Show 24-hour loads and assumptions
| Hour ICT | PV kW | Load kW | Self-use kW |
|---|---|---|---|
| 0 | 0 | 472.5 | 0 |
| 1 | 0 | 472.5 | 0 |
| 2 | 0 | 472.5 | 0 |
| 3 | 0 | 472.5 | 0 |
| 4 | 0 | 472.5 | 0 |
| 5 | 0 | 472.5 | 0 |
| 6 | 91.3 | 472.5 | 91.3 |
| 7 | 672.1 | 1,181.3 | 672.1 |
| 8 | 1,214.5 | 1,968.8 | 1,214.5 |
| 9 | 1,706.4 | 1,968.8 | 1,706.4 |
| 10 | 1,960.1 | 1,968.8 | 1,960.1 |
| 11 | 2,077.2 | 1,968.8 | 1,968.8 |
| 12 | 2,055.8 | 1,312.5 | 1,312.5 |
| 13 | 1,309.9 | 1,968.8 | 1,309.9 |
| 14 | 1,133.1 | 1,968.8 | 1,133.1 |
| 15 | 856.1 | 1,968.8 | 856.1 |
| 16 | 505.2 | 1,968.8 | 505.2 |
| 17 | 115.2 | 1,968.8 | 115.2 |
| 18 | 0 | 918.7 | 0 |
| 19 | 0 | 918.7 | 0 |
| 20 | 0 | 918.7 | 0 |
| 21 | 0 | 918.7 | 0 |
| 22 | 0 | 472.5 | 0 |
| 23 | 0 | 472.5 | 0 |
JRC PVGIS 5.3 ERA5 2023 · QAC-SOLAR-INDUSTRIAL-HCM-2023-R1
8. Rooftop PV installation and equipment images
Images already in the QAC content library; not photographs of this exact system.



9. Standards, checkpoints and FAQ
Confirm MPPT and cold Voc/Isc, AC/DC SPD and selectivity, earthing, roof/wind, utility interface and fire safety before construction.
Is this a final turnkey MV EPC quotation?
No. Only the priced BOQ scope is included. MV collector, new substation and PCC upgrades must be validated separately.
10. Construction video and related solutions
Watch PV installation video on YouTube
Video reference only, not project-completion evidence.
Industrial rooftop solar · Solar estimate library · Substation services
11. Estimate another solar system
Choose Solar & storage for your property
From electricity needs to a preliminary system and budget. No contact details required.
Automatic pre-survey calculations
Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.
Developed and operated by QuangAnhcons. Preliminary results require site survey and written confirmation before ordering or construction.
Solar 8.21.0 · QAC-UI-QUOTE 1.1.1
© 2026 QUANG ANH CONSTRUCTION ELECTRICITY COMPANY LIMITED. Quotation prepared by QuangAnhcons. Please retain the issuer name and reference when saving or sharing. Third-party names and materials belong to their respective owners.
Tiếng Việt
简体中文
Deutsch
日本語
한국어
ไทย
Русский
Français