Skip to content
  • English English
    • English English
    • Tiếng Việt Tiếng Việt
    • 简体中文 简体中文
    • Deutsch Deutsch
    • 日本語 日本語
    • 한국어 한국어
    • ไทย ไทย
    • Русский Русский
    • 繁體中文 繁體中文
    • Français Français
  • English English
    • English English
    • Tiếng Việt Tiếng Việt
    • 简体中文 简体中文
    • Deutsch Deutsch
    • 日本語 日本語
    • 한국어 한국어
    • ไทย ไทย
    • Русский Русский
    • 繁體中文 繁體中文
    • Français Français
QUANG ANH CE CO.,LTDQUANG ANH CE CO.,LTD
    MENUMENU
    • ABOUT US
    • PROJECT
    • OUR SERVICES
      • Substation Construction
      • Solar PV & Rooftop EPC
      • Industrial MV/LV Electrical
      • MV Lines & Underground Cables
      • EV Charging Infrastructure
      • Battery Storage & Integration
      • Testing, Maintenance & Upgrades
      • Survey, Design & BOQ
      • Electrical Panels
    • CAREERS
    • CONTACT
Home / Điện mặt trời áp mái

150 kWp Industrial Rooftop Solar | EPC Design and Budget

  • Ảnh minh họa dàn pin điện mặt trời hòa lưới và hệ hybrid

Industrial rooftop PV 150 kWp: 150.4 kWp DC, 125 kW AC, 235 LONGi modules, 78-line English budget BOQ. Indicative pre-survey estimate only.

Category: Điện mặt trời áp mái
  • Ảnh minh họa dàn pin điện mặt trời hòa lưới và hệ hybrid
Sản phẩm mới nhất
  • Hình ảnh hệ thống pin điện mặt trời áp mái — minh họa lựa chọn cấu hình 3 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • Minh họa dàn pin quang điện trong bài giải thích kWp kW và kWh 2 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • 10 MWp Industrial Rooftop Solar | Engineering and PV Budget 10 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • 5 MWp Industrial Rooftop Solar | Engineering and PV Budget 5 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • Hình ảnh hệ thống pin mặt trời trên mái — giới thiệu hồ sơ EPC và nghiệm thu 1.5 MWp Industrial Rooftop Solar | EPC Engineering and Budget
  • Description
Pre-survey reference estimate. Reference budget before site survey. Final electrical engineering, roof verification, equipment pricing, legal clearance and MV/PCC works require approval.

QUANGANHCONS | INDUSTRIAL EPC ENGINEERING

Industrial rooftop PV 150 kWp: equipment and EPC reference

A structured technical reference for factories evaluating rooftop PV, site electrical interfaces and EPC budgets.

QAC-SOL-EST-20261109-3EFF6678 · QAC Solar 8.21.0

150.4 kWpPV DC nameplate
125 kWTotal inverter AC
235 modulesLONGi 640 Wp modules

1. Applications and self-consumption

Final parameters depend on the actual site load, approved PCC topology, roof structure and installation routes.

2. Equipment nameplate and electrical configuration

Industrial PV on factory rooftops; verify the existing 400 V board, inverter feeder and export-limiting CT at the actual PCC. The purpose is to help factory owners review a self-consumption, grid-connected solar PV concept without battery storage. It is not evidence of a completed project or a utility-approved design.

DC 150.4 kWp
AC 125 kW
Modules 235 × 640 Wp

3. Engineering calculations

DC capacity = 235 × 640/1,000 = 150.4 kWp. DC/AC ratio = 150.4/125 = 1.2. Check inverter clipping, MPPT loading and temperature-adjusted string voltages with the actual datasheet.

Three-phase aggregate AC current at 400 V and assumed power factor 0.99: I = 125 × 1,000/(√3 × 400 × 0.99) ≈ 182.24 A, a mathematical aggregate only, not a single switchboard feeder selection. Confirm inverter maximum AC current, cable ampacity and fault-duty requirements independently.

4. Roof, protection and grid interface

Verify Voc at minimum cell temperature, Vmp at maximum cell temperature, string current per MPPT, DC isolators, SPD, AC fault current, feeder discrimination, earthing, roof anchoring, wind uplift, waterproofing, emergency access and safe commissioning. The utility PCC, transformer/MSB capacity and site demand profile must be confirmed before procurement or construction.

5. Programme and acceptance

Site survey → design and PCC protection review → procurement approval → safe roof preparation and PV/DC/AC installation → commissioning of protection, insulation, earthing and export-limiting controls → as-built documentation, operating instructions and handover. WBS durations and dependencies require a project-specific site baseline.

Indicative WBS/Gantt (no fixed dates)

1. Demand monitoring and survey

2. Electrical/PCC and roof design

3. Purchasing and HSE

4. Rooftop installation/DC/AC wiring

5. Commissioning and handover

6. 150 kWp Solar estimate — view and download

Quote reference: QAC-SOL-EST-20261109-3EFF6678 · QAC Solar 8.21.0 · Pre-survey reference

Before VAT: 1,804,800,000 đ · Illustrative VAT 10%: 180,480,000 đ · With VAT: 1,985,280,000 đ

OPEN FULL PDF ESTIMATE

DOWNLOAD PDF DOWNLOAD EXCEL BOQ

0 / 0 Open PDF Download PDF
Open the estimate in a new tab

Open PDF separately if mobile preview is blocked.

Preview matching source-locked PDF below. This is a preliminary budget; unit prices can be rounded and the actual utility/MV scope requires independent verification.

7. 12-month production and a representative 24-hour day

Example only, not surveyed production or measured load: PVGIS 5.3/ERA5 2023 HCMC (10.8231,106.6297), 10° south-facing, PVGIS loss 14% once, AC limits applied per configuration. Hypothetical factory operates Mon–Sat: 75% AC daytime load, 50% lunch, 35% evening, 18% overnight/Sundays; zero export assumed.

Monthly energy (kWh)Monthly energy (kWh) — Available PV, Direct PV self-use
Month━ Available PV━ Direct PV self-use
Month PV kWh Self-use kWh Curtailed kWh Load kWh
1 15,638 13,755 1,882 37,540
2 18,103 15,570 2,533 34,320
3 21,104 18,236 2,867 38,340
4 19,115 16,522 2,593 36,200
5 17,719 16,166 1,553 38,340
6 15,404 14,049 1,355 37,000
7 14,464 13,249 1,215 37,540
8 17,945 16,140 1,805 38,340
9 14,590 13,514 1,076 37,000
10 16,078 14,316 1,763 37,540
11 15,829 14,047 1,782 37,000
12 17,307 15,402 1,905 37,540

Representative day: 15 Mar 2023

Power over 24 hours (kW)Power over 24 hours (kW) — PV output, Assumed factory load, Direct PV self-use
Hour (UTC+7)━ PV output━ Assumed factory load━ Direct PV self-use
Show 24-hour loads and assumptions
Hour ICT PV kW Load kW Self-use kW
0 0 22.5 0
1 0 22.5 0
2 0 22.5 0
3 0 22.5 0
4 0 22.5 0
5 0 22.5 0
6 4.6 22.5 4.6
7 33.7 56.3 33.7
8 60.9 93.8 60.9
9 85.5 93.8 85.5
10 98.3 93.8 93.8
11 104.1 93.8 93.8
12 103.1 62.5 62.5
13 65.7 93.8 65.7
14 56.8 93.8 56.8
15 42.9 93.8 42.9
16 25.3 93.8 25.3
17 5.8 93.8 5.8
18 0 43.8 0
19 0 43.8 0
20 0 43.8 0
21 0 43.8 0
22 0 22.5 0
23 0 22.5 0

JRC PVGIS 5.3 ERA5 2023 · QAC-SOLAR-INDUSTRIAL-HCM-2023-R1

8. Rooftop PV installation and equipment images

Images already in the QAC content library; not photographs of this exact system.

Industrial PV reference image 1
Industrial PV reference image 2
Industrial PV reference image 3

9. Standards, checkpoints and FAQ

Assess IEC 62548-1, IEC 60364-7-712 and applicable Vietnamese electrical, structural, fire and grid rules. LONGi PV module datasheet is an equipment reference, not a design approval.

Standalone English searchable PDF and formula-backed Excel for QAC-SOL-EST-20261109-3EFF6678 will only be linked after the VI/EN single-snapshot and site engineering checks pass. The full itemised BOQ is available for online reading in the table above.

Read the Vietnamese reference profile or the existing bilingual estimate PDF library.

Confirm MPPT and cold Voc/Isc, AC/DC SPD and selectivity, earthing, roof/wind, utility interface and fire safety before construction.

Is this a final turnkey MV EPC quotation?

No. Only the priced BOQ scope is included. MV collector, new substation and PCC upgrades must be validated separately.

10. Construction video and related solutions

Watch PV installation video on YouTube

Video reference only, not project-completion evidence.

Industrial rooftop solar · Solar estimate library · Substation services

11. Estimate another solar system

QUANGANHCONS · SOLAR EPC

Choose Solar & storage for your property

From electricity needs to a preliminary system and budget. No contact details required.

1. What should the system do?

Answer step by step; no kWp knowledge or contact details needed.

2. How much electricity do you use?

Use kWh from the bill where possible; otherwise enter the bill amount with an explicit conversion assumption.

I know the capacity / effective electricity rate
3. Where will the array connect and fit?
4. What must run during an outage?

Your selected goal excludes outage supply. Evening storage does not automatically include backup. Change step 1 if needed.

Enter quantities. Example ratings may differ from your appliances; measured loads can be entered in step 5.

Backup has its own budget. ATS alone is insufficient: grid-forming PCS, compatible battery, protection and load isolation are required. Outage duration excludes PV generation.

5. More information? Optional

Continue if you do not have measurements. Technical users can replace assumptions here.

Roof, cable routes and connection
Backup load and battery assumptions

Average kW determines energy; simultaneous kW determines power. When entering average load, also enter simultaneous load. These override appliance examples.

Load profile and site-specific yield If selected, the server sends coordinates rounded to 4 decimals and array orientation to JRC PVGIS. No name, email or bill is sent. A labelled fallback is used if unavailable.
6. Review and get a proposal

Results include equipment, quantities, budget, additions, assumptions and survey needs. View/download the preliminary budget without contact details.

Calculations are retained temporarily for up to 30 minutes. Contact details are stored when you submit an advice, survey or price proposal request.

Technical settings & supply scope

Preliminary defaults are selected. Adjust the roof, equipment, connection and cable routes here.

Battery energy storage (optional)

Capacity is rounded to whole modules/cabinets. Backup defaults: SOC 90% to 10%, SOH 90%, discharge efficiency 95%, power derating 10%. Adjust these assumptions through the assistant when data is available. Backup is priced separately; compatibility and transfer time remain unverified.

Scope and budget basis

Preliminary quantities and rates follow the entered configuration and require survey/design confirmation. Basic scope includes standard rails, clamps and module attachments on a suitable existing structure. Select raised frames, foundations, reinforcement, storage or a new transformer to price additions.

Roof height is measured from ground; rack clearance is separate, above the roof/ground surface. Area and row pitch are layout estimates, not approved drawings or wind, structural, waterproofing or fire assessments. VAT follows the quote configuration and requires contract/invoice confirmation.

Automatic pre-survey calculations

Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.

Quotation contact details

QuangAnhcons will review and send your PDF via sales@quanganhcgte.com.

Proposed survey appointment

QuangAnhcons will contact you to confirm. This is not a confirmed appointment.

Developed and operated by QuangAnhcons. Preliminary results require site survey and written confirmation before ordering or construction.

Solar 8.21.0 · QAC-UI-QUOTE 1.1.1

© 2026 QUANG ANH CONSTRUCTION ELECTRICITY COMPANY LIMITED. Quotation prepared by QuangAnhcons. Please retain the issuer name and reference when saving or sharing. Third-party names and materials belong to their respective owners.

QUANG ANH CE CO., LTD

Address: 09th floor, Pearl Plaza Building, 561A Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City, Vietnam

Hotline: (+84) 9 1975 8191

Email: sales@quanganhcgte.com

Tax Code: 0316365712

  • ABOUT US
  • PROJECT
  • OUR SERVICES
    • Substation Construction
    • Solar PV & Rooftop EPC
    • Industrial MV/LV Electrical
    • MV Lines & Underground Cables
    • EV Charging Infrastructure
    • Battery Storage & Integration
    • Testing, Maintenance & Upgrades
    • Survey, Design & BOQ
    • Electrical Panels
  • CAREERS
  • CONTACT

Login

Lost your password?

Gọi ngayZaloWhatsAppEmailYouTubeTikTok