Electrical Survey, Design & BOQ Services in Vietnam

Get a useful budget early, then remove assumptions before construction.

Suitable stageConcept planning, pre-tender review and defined design development
Core outputsDesign basis, drawings, quantity schedules and RFQ documentation
Commercial approachDocument review first; survey scope and fees agreed in advance

What this service covers

QuangAnhcons helps factory owners, investors and main contractors turn an electrical brief into a defined design and pricing package. Services can begin with remote review of drawings and load information, followed by targeted site verification, engineering coordination and a traceable bill of quantities for tendering or construction planning.

Discuss your project in English with our team. Our priority delivery area is Southern Vietnam; project location, access and mobilization are confirmed during quotation.

A defined scope from design to handover

Pre-survey document review

Review the project brief, site plan, equipment loads, utility conditions and available designs. Identify what can be priced immediately and what remains an assumption or information request.

Targeted survey and verification

Define the survey questions before visiting. Verify relevant routes, dimensions, existing assets, access and interfaces within an agreed scope. Specialist structural, geotechnical or diagnostic work is separately assigned.

Electrical design and coordination

Develop or review load schedules, single-line diagrams, equipment arrangements, feeder routes and interface requirements at the agreed design stage. Coordinate with architecture, civil, process and other MEP disciplines.

BOQ and tender support

Measure quantities against a stated drawing revision, structure specification-linked line items and prepare supplier/contractor RFQs. Record clarifications, alternatives and exclusions so offers can be compared fairly.

Engineering decisions that shape your project

Use a design-stage label on every deliverable

A concept estimate supports option selection. A developed tender package supports comparable contractor pricing. Approved construction/shop drawings support installation within the project approval process. As-built records document what was installed. These deliverables have different maturity levels and should not be treated as interchangeable.

Make load assumptions auditable

Record connected load, running load, motor starting, simultaneity, power factor and future expansion by equipment or load group. State which values came from owner data, manufacturer data or assumptions. Unknown data should generate an information request rather than a false precision in the design.

Measure quantities against geometry and interfaces

Separate route length from purchased cable length, cable cores from circuits and switchboard sets from outgoing feeders. Count terminations, supports, earthing connections, fire stopping, labels and testing. Assign responsibilities at transformer, board and equipment terminals so neither omissions nor double counting are built into the BOQ.

Control revisions and cost uncertainty

Give each BOQ line a unit, quantity, description and drawing/specification reference where appropriate. Identify provisional quantities and allowances explicitly. A revised route or load list should trigger a visible quantity or specification change, allowing the client to understand its cost and programme impact.

Coordinate construction, safety and approvals

Design packages consider access for installation and maintenance, equipment clearances, protection, earthing and the relevant project requirements. Licensed/statutory design, authority submissions and independent verification are included only where the contract assigns them and appropriately qualified parties are appointed.

What belongs in the bill of quantities

Typical BOQ structure — final quantities follow the agreed design. Swipe horizontally on a narrow screen.
Work or material group Measurement basis What the offer should define
Document review and brief development Package Inputs reviewed, assumptions and clarification register
Site survey Visit / zone / agreed scope Personnel, duration, measurements and access requirements
Design calculations and drawings Deliverable / package Defined design stage, boundaries and revision allowance
Quantity take-off and BOQ System / package Measured quantities, units and referenced specifications
Supplier RFQ and comparison Package / equipment group Technical clarifications and comparable exclusions
Construction interface support Meeting / visit / period Agreed coordination scope and response arrangements
Engineering and survey fees depend on information quality, system complexity, deliverables, review cycles and site access. For a new factory, remote review can precede a survey. If an early survey is requested, its fee and any credit against a later construction contract should be agreed in writing. Do not assume a free survey or unlimited redesign is included.

From your brief to acceptance

  1. Send available drawings, load information, connection data and objectives.
  2. Receive a gap list, proposed deliverables and the basis of the preliminary budget.
  3. Agree any survey scope, fee and how it may be credited to a subsequent contract.
  4. Develop the design and BOQ through defined review checkpoints.
  5. Resolve interfaces, specifications, alternatives and tender clarifications.
  6. Issue the agreed revision with an assumptions register and next-stage actions.

Documents you should receive

  • Input register and design-basis/assumptions document
  • Information requests and survey findings for the agreed scope
  • Electrical calculations and drawings at the contracted design stage
  • BOQ with units, quantities and specification references
  • Supplier/contractor RFQ package and comparison notes if included
  • Revision record, exclusions and outstanding decisions

The quotation identifies included documents, review cycles, approvals, acceptance criteria, exclusions and warranty obligations.

Frequently asked questions

Can I get a quotation without an immediate site visit?

Yes. Supply the layout, load list, connection point, scope and target programme. The initial offer will state its assumptions and identify the specific items needing later site verification.

What if the factory has not been constructed?

Use the architectural plan, production layout, equipment data and utility conditions. Physical survey work can then focus on the site boundary, connection route and constraints that already exist.

Will the BOQ contain quantities for every final installation item?

A BOQ is complete only to its stated scope and design maturity. Provisional quantities and unknown equipment interfaces must remain visible until resolved. An early estimate should not be represented as a fully coordinated construction take-off.

Can your documents be used to compare other contractors?

The contracted tender package can be structured for that purpose. Confirm permitted use, document ownership, required professional approvals and the level of design detail in the engagement.

Technical reference framework

Relevant engineering references are selected for the contracted equipment and installation. Applicable Vietnamese requirements, local network conditions, manufacturer instructions and the agreed design basis determine project compliance; listing a standard is not a certification claim.

    YOUR PROJECT · A CLEAR NEXT STEP

    Send the information needed for a useful quotation

    Start with the drawings and data you already have. We can identify what can be priced now and which points require verification.

    • Project type, location and development stage
    • Architectural/site plan and equipment layout
    • Load list and utility connection information
    • Existing design or BOQ and required deliverable format
    • Budget objective, tender/construction programme and review contacts
    • Whether remote review only or a priced site survey is required

    Contact QuangAnhcons

    +84 919 758 191
    sales@quanganhcgte.com

    The email button opens your mail app with a service-specific brief. Attach drawings or share a viewable document link before sending.

    QUANGANHCONS · Electrical construction and energy integration in Vietnam.
    View all services · Content reviewed 18 October 2026.

    Dự toán điện mặt trời

    Thiết bị chính

    Tấm pin
    Inverter

    Phạm vi muốn tính

    Đấu nối và trạm biến áp
    Lưu trữ năng lượng BESS (tùy chọn)

    Dung lượng làm tròn theo bộ/tủ nguyên. Backup mặc định SOC 90% đến 10%, SOH 90%, hiệu suất xả 95%, giảm công suất 10%; xem và điều chỉnh qua trợ lý nếu có dữ liệu. Phần dự phòng được cộng tiền riêng, chưa phải xác nhận tương thích hoặc cam kết thời gian chuyển nguồn.

    Thiết bị chủ đầu tư cấp và xây lắp bổ sung
    Đã có số liệu kỹ thuật?
    Thủ tục EPC và đấu nối
    Bức xạ và sản lượng theo địa điểm Khi có ghim, tool tự tra sản lượng tại vị trí đã chọn. Nếu chưa có dữ liệu tại điểm, có thể dùng vùng tham chiếu.
    Phạm vi và cơ sở dự toán

    Khối lượng và đơn giá sơ bộ theo cấu hình đã nhập; xác nhận lại sau khảo sát và thiết kế. Giá cơ sở có bộ rail, kẹp và chân liên kết pin thông thường trên kết cấu hiện hữu đủ điều kiện. Chọn giàn cao, móng, gia cường, BESS hoặc trạm mới để tính các hạng mục bổ sung.

    Cao độ mái tính từ mặt đất; độ nâng khung tính riêng từ mặt mái/sân. Diện tích và khoảng cách hàng pin là ước tính bố trí, chưa thay bản vẽ, kiểm tra tải gió, kết cấu, chống thấm và PCCC. VAT theo cấu hình báo giá, xác nhận theo hợp đồng/hóa đơn.

    Vị trí công trình

    Chọn kết quả hoặc ghim đúng mái để tra sản lượng. PVGIS nhận tọa độ làm tròn và hướng lắp.

    Bản đồ công trình
    Hoàng Sa, Trường Sa là của Việt NamChọn địa chỉ, nhấp bản đồ hoặc kéo ghim đến đúng mái. Có thể bỏ qua vị trí khi lập dự toán.
    Mở bản đồ rộng

      Vị trí dự án được làm tròn. Khoảng cách trên bản đồ là đường thẳng ước tính.Global Energy Monitor · CC BY 4.0 · Natural Earth

      Quick Substation 2.1.28 · Estimate a single substation or a multi-station project and view its quotation, calculations, load register and schedule.

      Quick substation quotation

      Loading the tool…

      Developed and operated by QuangAnhcons. Results are preliminary estimates based on the information provided; the configuration, scope and price are confirmed in the quotation or contract before ordering or construction.

      Quick Substation 2.1.28

      © 2026 QUANG ANH CE CO., LTD. Please retain the issuer’s name and reference when saving or sharing documents. Third-party names, trademarks and materials belong to their respective owners.