Skip to content
  • English English
    • English English
    • Tiếng Việt Tiếng Việt
    • 简体中文 简体中文
    • Deutsch Deutsch
    • 日本語 日本語
    • 한국어 한국어
    • ไทย ไทย
    • Русский Русский
    • 繁體中文 繁體中文
    • Français Français
  • English English
    • English English
    • Tiếng Việt Tiếng Việt
    • 简体中文 简体中文
    • Deutsch Deutsch
    • 日本語 日本語
    • 한국어 한국어
    • ไทย ไทย
    • Русский Русский
    • 繁體中文 繁體中文
    • Français Français
QUANG ANH CE CO.,LTDQUANG ANH CE CO.,LTD
    MENUMENU
    • ABOUT US
    • PROJECT
    • OUR SERVICES
      • Substation Construction
      • Solar PV & Rooftop EPC
      • Industrial MV/LV Electrical
      • MV Lines & Underground Cables
      • EV Charging Infrastructure
      • Battery Storage & Integration
      • Testing, Maintenance & Upgrades
      • Survey, Design & BOQ
      • Electrical Panels
    • CAREERS
    • CONTACT
Ảnh minh họa dàn pin điện mặt trời hòa lưới và hệ hybrid
Home / Điện mặt trời áp mái

300 kWp Industrial Rooftop Solar | EPC Engineering and Budget

  • Tư liệu dàn pin điện mặt trời áp mái — bài toán lựa chọn công suất kWp

Industrial rooftop PV 300 kWp, 300.16 kWp DC, 250 kW AC. English 78-line BOQ, indicative budget, not a firm quote.

Category: Điện mặt trời áp mái
  • Tư liệu dàn pin điện mặt trời áp mái — bài toán lựa chọn công suất kWp
Sản phẩm mới nhất
  • Hình ảnh hệ thống pin điện mặt trời áp mái — minh họa lựa chọn cấu hình 3 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • Minh họa dàn pin quang điện trong bài giải thích kWp kW và kWh 2 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • 10 MWp Industrial Rooftop Solar | Engineering and PV Budget 10 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • 5 MWp Industrial Rooftop Solar | Engineering and PV Budget 5 MWp Industrial Rooftop Solar | Engineering and PV Budget
  • Hình ảnh hệ thống pin mặt trời trên mái — giới thiệu hồ sơ EPC và nghiệm thu 1.5 MWp Industrial Rooftop Solar | EPC Engineering and Budget
  • Description
Pre-survey reference estimate. Reference budget before site survey. Final electrical engineering, roof verification, equipment pricing, legal clearance and MV/PCC works require approval.

QUANGANHCONS | INDUSTRIAL EPC ENGINEERING

Industrial rooftop PV 300 kWp: equipment and EPC reference

A structured technical reference for factories evaluating rooftop PV, site electrical interfaces and EPC budgets.

QAC-SOL-EST-20261109-903BFC76 · QAC Solar 8.21.0

300.16 kWpPV DC nameplate
250 kWTotal inverter AC
469 modulesLONGi 640 Wp modules

1. Applications and self-consumption

The two 125 kW inverter reference arrangement needs a coordinated AC collector and MSB/PCC connection with verified transformer reserve capacity. The system is a grid-connected self-consumption PV reference, excluding battery storage; it is not evidence of a completed installation.

2. Equipment nameplate and electrical configuration

Capacity class 300 kWp
PV modules 469 × LONGi Solar LR7-72HVH-640M, 640 Wp
Installed DC power 300.16 kWp
Inverters 2 × Sungrow SG125CX-P2
Combined AC rating 250 kW
PV strings 27, subject to MPPT allocation checks
DC/AC ratio 1.2
Reference QAC-SOL-EST-20261109-903BFC76 · 09 Nov 2026

3. Engineering calculations

PDC = 469 × 640/1,000 = 300.16 kWp. DC/AC ratio = 300.16/250 = 1.2. PV output and clipping depend on inverter model, MPPT assignment, module temperature and irradiance.

At 400 V three phase and assumed power factor 0.99, aggregate AC current is 250 × 1,000/(√3 × 400 × 0.99) ≈ 364.49 A. This is a mathematical aggregate, not a one-feeder design. Calculate protective device ratings, cable ampacity, voltage drop and prospective fault level separately for each AC section and PCC.

4. Roof, protection and grid interface

The two 125 kW inverter reference arrangement needs a coordinated AC collector and MSB/PCC connection with verified transformer reserve capacity. The system is a grid-connected self-consumption PV reference, excluding battery storage; it is not evidence of a completed installation.

5. Programme and acceptance

Survey and SLD approval → material procurement → safe installation of mounting and PV DC/AC circuits → protection/earthing/insulation tests → commissioning and as-built documentation. Project duration, utility requirements and exclusions will be confirmed after survey.

Indicative WBS/Gantt (no fixed dates)

1. Demand monitoring and survey

2. Electrical/PCC and roof design

3. Purchasing and HSE

4. Rooftop installation/DC/AC wiring

5. Commissioning and handover

6. 300 kWp Solar estimate — view and download

Quote reference: QAC-SOL-EST-20261109-903BFC76 · QAC Solar 8.21.0 · Pre-survey reference

Before VAT: 3,601,920,000 đ · Illustrative VAT 10%: 360,192,000 đ · With VAT: 3,962,112,000 đ

OPEN FULL PDF ESTIMATE

DOWNLOAD PDF DOWNLOAD EXCEL BOQ

0 / 0 Open PDF Download PDF
Open the estimate in a new tab

Open PDF separately if mobile preview is blocked.

Preview matching source-locked PDF below. This is a preliminary budget; unit prices can be rounded and the actual utility/MV scope requires independent verification.

7. 12-month production and a representative 24-hour day

Example only, not surveyed production or measured load: PVGIS 5.3/ERA5 2023 HCMC (10.8231,106.6297), 10° south-facing, PVGIS loss 14% once, AC limits applied per configuration. Hypothetical factory operates Mon–Sat: 75% AC daytime load, 50% lunch, 35% evening, 18% overnight/Sundays; zero export assumed.

Monthly energy (kWh)Monthly energy (kWh) — Available PV, Direct PV self-use
Month━ Available PV━ Direct PV self-use
Month PV kWh Self-use kWh Curtailed kWh Load kWh
1 31,209 27,463 3,746 75,080
2 36,130 31,093 5,037 68,640
3 42,118 36,422 5,696 76,680
4 38,148 32,989 5,160 72,400
5 35,362 32,273 3,089 76,680
6 30,742 28,045 2,697 74,000
7 28,866 26,450 2,416 75,080
8 35,814 32,222 3,592 76,680
9 29,117 26,977 2,141 74,000
10 32,088 28,579 3,509 75,080
11 31,591 28,045 3,546 74,000
12 34,540 30,749 3,791 75,080

Representative day: 15 Mar 2023

Power over 24 hours (kW)Power over 24 hours (kW) — PV output, Assumed factory load, Direct PV self-use
Hour (UTC+7)━ PV output━ Assumed factory load━ Direct PV self-use
Show 24-hour loads and assumptions
Hour ICT PV kW Load kW Self-use kW
0 0 45 0
1 0 45 0
2 0 45 0
3 0 45 0
4 0 45 0
5 0 45 0
6 9.1 45 9.1
7 67.2 112.5 67.2
8 121.5 187.5 121.5
9 170.7 187.5 170.7
10 196.1 187.5 187.5
11 207.8 187.5 187.5
12 205.7 125 125
13 131 187.5 131
14 113.4 187.5 113.4
15 85.7 187.5 85.7
16 50.5 187.5 50.5
17 11.5 187.5 11.5
18 0 87.5 0
19 0 87.5 0
20 0 87.5 0
21 0 87.5 0
22 0 45 0
23 0 45 0

JRC PVGIS 5.3 ERA5 2023 · QAC-SOLAR-INDUSTRIAL-HCM-2023-R1

8. Rooftop PV installation and equipment images

Images already in the QAC content library; not photographs of this exact system.

Industrial PV reference image 1
Industrial PV reference image 2
Industrial PV reference image 3

9. Standards, checkpoints and FAQ

Review IEC 62548-1, IEC 60364-7-712 and applicable Vietnamese electrical/fire/building requirements. PV module family reference: LONGi 640 Wp datasheet; verify the exact inverter datasheet and firmware.

Confirm MPPT and cold Voc/Isc, AC/DC SPD and selectivity, earthing, roof/wind, utility interface and fire safety before construction.

Is this a final turnkey MV EPC quotation?

No. Only the priced BOQ scope is included. MV collector, new substation and PCC upgrades must be validated separately.

10. Construction video and related solutions

Watch PV installation video on YouTube

Video reference only, not project-completion evidence.

Industrial rooftop solar · Solar estimate library · Substation services

11. Estimate another solar system

QUANGANHCONS · SOLAR EPC

Choose Solar & storage for your property

From electricity needs to a preliminary system and budget. No contact details required.

1. What should the system do?

Answer step by step; no kWp knowledge or contact details needed.

2. How much electricity do you use?

Use kWh from the bill where possible; otherwise enter the bill amount with an explicit conversion assumption.

I know the capacity / effective electricity rate
3. Where will the array connect and fit?
4. What must run during an outage?

Your selected goal excludes outage supply. Evening storage does not automatically include backup. Change step 1 if needed.

Enter quantities. Example ratings may differ from your appliances; measured loads can be entered in step 5.

Backup has its own budget. ATS alone is insufficient: grid-forming PCS, compatible battery, protection and load isolation are required. Outage duration excludes PV generation.

5. More information? Optional

Continue if you do not have measurements. Technical users can replace assumptions here.

Roof, cable routes and connection
Backup load and battery assumptions

Average kW determines energy; simultaneous kW determines power. When entering average load, also enter simultaneous load. These override appliance examples.

Load profile and site-specific yield If selected, the server sends coordinates rounded to 4 decimals and array orientation to JRC PVGIS. No name, email or bill is sent. A labelled fallback is used if unavailable.
6. Review and get a proposal

Results include equipment, quantities, budget, additions, assumptions and survey needs. View/download the preliminary budget without contact details.

Calculations are retained temporarily for up to 30 minutes. Contact details are stored when you submit an advice, survey or price proposal request.

Technical settings & supply scope

Preliminary defaults are selected. Adjust the roof, equipment, connection and cable routes here.

Battery energy storage (optional)

Capacity is rounded to whole modules/cabinets. Backup defaults: SOC 90% to 10%, SOH 90%, discharge efficiency 95%, power derating 10%. Adjust these assumptions through the assistant when data is available. Backup is priced separately; compatibility and transfer time remain unverified.

Scope and budget basis

Preliminary quantities and rates follow the entered configuration and require survey/design confirmation. Basic scope includes standard rails, clamps and module attachments on a suitable existing structure. Select raised frames, foundations, reinforcement, storage or a new transformer to price additions.

Roof height is measured from ground; rack clearance is separate, above the roof/ground surface. Area and row pitch are layout estimates, not approved drawings or wind, structural, waterproofing or fire assessments. VAT follows the quote configuration and requires contract/invoice confirmation.

Automatic pre-survey calculations

Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.

Quotation contact details

QuangAnhcons will review and send your PDF via sales@quanganhcgte.com.

Proposed survey appointment

QuangAnhcons will contact you to confirm. This is not a confirmed appointment.

Developed and operated by QuangAnhcons. Preliminary results require site survey and written confirmation before ordering or construction.

Solar 8.21.0 · QAC-UI-QUOTE 1.1.1

© 2026 QUANG ANH CONSTRUCTION ELECTRICITY COMPANY LIMITED. Quotation prepared by QuangAnhcons. Please retain the issuer name and reference when saving or sharing. Third-party names and materials belong to their respective owners.

QUANG ANH CE CO., LTD

Address: 09th floor, Pearl Plaza Building, 561A Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City, Vietnam

Hotline: (+84) 9 1975 8191

Email: sales@quanganhcgte.com

Tax Code: 0316365712

  • ABOUT US
  • PROJECT
  • OUR SERVICES
    • Substation Construction
    • Solar PV & Rooftop EPC
    • Industrial MV/LV Electrical
    • MV Lines & Underground Cables
    • EV Charging Infrastructure
    • Battery Storage & Integration
    • Testing, Maintenance & Upgrades
    • Survey, Design & BOQ
    • Electrical Panels
  • CAREERS
  • CONTACT

Login

Lost your password?

Gọi ngayZaloWhatsAppEmailYouTubeTikTok