EV Charging Infrastructure Contractor in Vietnam

Plan charging capacity around real vehicles, dwell time and available power.

ApplicationsEmployee parking, commercial destinations and fleet/depot charging
Charging typesAC destination charging and project-specific DC fast charging
Design priorityVehicle demand, available grid capacity and a staged expansion plan

What this service covers

QuangAnhcons supports the electrical infrastructure required for EV charging at factories, fleet depots, commercial premises and parking facilities in Vietnam. The package can include supply assessment, transformer and distribution interfaces, chargers, containment, grounding, load management and commissioning, subject to an agreed charger and operating-system specification.

Discuss your project in English with our team. Our priority delivery area is Southern Vietnam; project location, access and mobilization are confirmed during quotation.

A defined scope from design to handover

Charging demand assessment

Define the number of vehicles, daily energy needs, arrival/departure patterns and required service level. Compare charger counts and power against actual dwell time and vehicle acceptance limits.

Electrical source and distribution

Assess incoming supply, transformer headroom, MSB capacity, feeders, protective devices and metering. Identify whether existing capacity, managed charging or a supply upgrade is appropriate.

Charger and site integration

Coordinate charger foundations, parking geometry, cable reach, bollards, accessibility, drainage, weather protection and equipment access. Confirm responsibility for communications, software and payment services.

Testing and operator handover

Verify electrical protective measures and demonstrate charging, stop functions, alarms, metering and agreed backend communications using the selected charger platform.

Engineering decisions that shape your project

Energy demand is different from charger nameplate power

A vehicle requiring 60 kWh over an eight-hour parking period has an average energy-delivery requirement of 7.5 kW before charging losses and interruptions. It may not require a high-power DC charger. Conversely, a short turnaround window can make DC charging necessary even if daily energy is modest.

Size the AC supply from the charger input

For a DC charger, grid input exceeds delivered DC power because of conversion losses and auxiliaries. In a hypothetical four-charger scheme at 120 kW DC each, 95% conversion efficiency and 10 kW of shared auxiliaries give about 515 kW AC. At assumed PF 0.98, the demand is approximately 526 kVA. Actual equipment input ratings and simultaneous operation govern the final design.

Load management must be enforceable

A diversity factor is only defensible when supported by operations or a verified control scheme. Dynamic load management can limit total site demand, but loss of communication, fallback limits, priority rules and minimum charging performance must be tested. Avoid promising the sum of charger ratings when the incoming power is deliberately constrained.

Safety, communications and compatibility

Confirm the manufacturer's residual-current and DC leakage provisions, protective earthing, disconnection, surge protection, enclosure rating and emergency arrangements. Verify vehicle connectors and communication/backend compatibility for the intended operating model. An advertised protocol label alone does not prove end-to-end interoperability or payment integration.

What belongs in the bill of quantities

Typical BOQ structure — final quantities follow the agreed design. Swipe horizontally on a narrow screen.
Work or material group Measurement basis What the offer should define
AC or DC charging equipment Unit / connector Output/input ratings, connectors and operating platform
Incoming supply and transformer works Set / circuit Included only where required by the confirmed capacity study
Charging distribution and feeders Board / m / termination Protection, metering, cables and containment
Civil and parking works Foundation / bay / m² Plinths, bollards, drainage and reinstatement
Controls and communications Point / system Demand control, network and backend integration scope
Testing and training Package Electrical verification, functional tests and operator handover
Compare total installed cost, including electrical supply, civil work, chargers, protection, communications and commissioning. Ongoing software, connectivity, transaction fees and maintenance may sit outside the construction contract. Grid upgrades and network-owner charges need explicit treatment. Charging revenue or utilization is not guaranteed by equipment installation.

From your brief to acceptance

  1. Define vehicles, energy demand, dwell time and the charging business model.
  2. Assess the existing supply and compare managed-demand and upgrade options.
  3. Select the charger platform and approve the electrical/civil interfaces.
  4. Agree equipment lead times, BOQ and site works programme.
  5. Install, configure and test the chargers and demand controls.
  6. Demonstrate operations and deliver documentation, training and warranty contacts.

Documents you should receive

  • Demand assessment and staged capacity proposal
  • Single-line diagram and charger/parking layout
  • Cable/protection schedule and itemized BOQ
  • Charger datasheets and platform responsibility matrix
  • Electrical and functional commissioning records
  • Operator instructions, account handover and warranty allocation

The quotation identifies included documents, review cycles, approvals, acceptance criteria, exclusions and warranty obligations.

Frequently asked questions

Does installing chargers always require a new transformer?

No. Check measured peak demand, spare source and distribution capacity, charging hours and the effect of load management. Some sites can use existing capacity; others require an upgrade.

Will every vehicle charge at the station's rated power?

No. Actual power depends on the vehicle, battery state, temperature, charger configuration, shared power allocation and site limits.

Can a project combine charging with solar and storage?

Yes, after a coordinated demand and controls study. Solar generation timing and storage dispatch must match the charging profile and the permitted electrical operating arrangement.

Does the package include billing software?

Only if specified. The offer should identify the backend provider, subscriptions, payment integration, data ownership, commissioning responsibilities and support arrangements.

Technical reference framework

Relevant engineering references are selected for the contracted equipment and installation. Applicable Vietnamese requirements, local network conditions, manufacturer instructions and the agreed design basis determine project compliance; listing a standard is not a certification claim.

    YOUR PROJECT · A CLEAR NEXT STEP

    Send the information needed for a useful quotation

    Start with the drawings and data you already have. We can identify what can be priced now and which points require verification.

    • Site location and parking/depot layout
    • Vehicle types, quantities and daily charging energy
    • Arrival, departure and target turnaround times
    • Existing transformer, contracted capacity and electrical drawings
    • Preferred charger brand, connectors and backend platform
    • Number of initial bays, expansion target and delivery programme

    Contact QuangAnhcons

    +84 919 758 191
    sales@quanganhcgte.com

    The email button opens your mail app with a service-specific brief. Attach drawings or share a viewable document link before sending.

    QUANGANHCONS · Electrical construction and energy integration in Vietnam.
    View all services · Content reviewed 18 October 2026.

    QUANGANHCONS · SOLAR EPC

    Chọn hệ Solar & lưu trữ cho công trình

    Từ nhu cầu sử dụng điện đến cấu hình và dự toán sơ bộ. Không cần thông tin liên hệ.

    Thông số kỹ thuật & phạm vi cung cấp

    Đã chọn sẵn cấu hình sơ bộ. Mở để điều chỉnh mái, thiết bị, đấu nối và tuyến cáp.

    Lưu trữ năng lượng BESS (tùy chọn)

    Dung lượng làm tròn theo bộ/tủ nguyên. Backup mặc định SOC 90% đến 10%, SOH 90%, hiệu suất xả 95%, giảm công suất 10%; xem và điều chỉnh qua trợ lý nếu có dữ liệu. Phần dự phòng được cộng tiền riêng, chưa phải xác nhận tương thích hoặc cam kết thời gian chuyển nguồn.

    Phạm vi và cơ sở dự toán

    Khối lượng và đơn giá sơ bộ theo cấu hình đã nhập; xác nhận lại sau khảo sát và thiết kế. Giá cơ sở có bộ rail, kẹp và chân liên kết pin thông thường trên kết cấu hiện hữu đủ điều kiện. Chọn giàn cao, móng, gia cường, BESS hoặc trạm mới để tính các hạng mục bổ sung.

    Cao độ mái tính từ mặt đất; độ nâng khung tính riêng từ mặt mái/sân. Diện tích và khoảng cách hàng pin là ước tính bố trí, chưa thay bản vẽ, kiểm tra tải gió, kết cấu, chống thấm và PCCC. VAT theo cấu hình báo giá, xác nhận theo hợp đồng/hóa đơn.

    Cụm tính toán tự động trước khảo sát

    Kết quả hiện ở đây khi nhập đủ dữ liệu: diện tích pin, phần phụ trợ, mái cần dùng, tải module, công suất và cấu hình điện.

    QUANGANHCONS

    Substation budget estimate

    Select the capacity, route lengths and package to view your indicative budget and electrical parameters.

    01   Quick estimate

    Cable and power-factor correction conditions
    Request a project quotation

    Send your project details, BOQ or drawings to request a formal quotation. Fields marked * are required.

    Reference quick estimate
    No quick estimate yet. You can still submit a project quotation request.

    Quotation scope

    Applies to one EVN-supplied substation with oil-immersed transformers at 22/0.4 kV (single-phase: 12.7/0.23 kV), with MV metering VTs/CTs supplied by EVN. The estimate includes the selected equipment, installation, earthing, transformer-to-main-breaker connections, design and connection documentation, and coordination of testing and utility acceptance.

    Kiosk, integrated steel-pole and indoor substations include MV switchgear and the entered underground cable route. Other outdoor arrangements use the relevant protection configuration. The final diagram must meet the project connection requirements.

    Excludes VAT, cables from the substation switchboard to the MSB/loads, live-line work, harmonic reactors, weak-ground treatment or special piling, land and special fire-protection provisions. Underground routes assume normal construction conditions and exclude road drilling and special reinstatement.

    Prices are indicative investment budgets. A formal quotation follows site assessment and agreement on the configuration. Electrical selections are preliminary and require design verification before installation.

    Capacity range and application conditions

    The catalogue defines the enquiry range of this tool, not universal TCVN capacity limits. Single pole-mounted transformers: 15–100 kVA; three-unit banks: 3×15–3×100 kVA. Platform substations: 100–630 kVA. Steel-pole substations: 100–630 kVA; 750/800 kVA require design verification and local approval. Ground-mounted, kiosk and indoor configurations: 50–10,000 kVA. Not every configuration has a package price or the same structural design.

    Reference: EVN Decision 1299/QD-EVN dated 3 November 2017, Volume 1, sections 3.3–3.4. Check the current requirements of the responsible utility before implementation. Kiosks must meet manufacturer ratings and testing requirements (IEC 62271-202); indoor and ground-mounted arrangements must meet project layout, ventilation, structural and fire-protection requirements. For multiple transformers, specify the quantity and capacity of each unit.