Electricity Grid Upgrade and Substation Relocation Project

Project: Upgrade of medium and low voltage electricity grid, relocation of 4 400KVA road lighting substation, ensuring the safety and aesthetics of the electricity grid, and urban renovation.

Construction site: 600 Dien Bien Phu, Ward 22, Binh Thanh District, Ho Chi Minh City

Owner: Hoan Cau Company Limited

Contractor: Quang Anh Electrical Construction Company Limited

Commencement date: September 16, 2022 – Completion date: September 27, 2022

Hoan Cau Company Limited has implemented a project to upgrade the medium and low voltage electricity grid in the area of Dien Bien Phu Street, Ward 22, Binh Thanh District, Ho Chi Minh City. This project is carried out to ensure the safety and aesthetics of the electricity grid and urban renovation.

Quanganh construction video at 600 Điện Bien Phu, 22 ward, Binh Thanh district, HoChiMinh city

The project includes the relocation of the 4 400KVA road lighting substation and installation of other new materials and equipment (100% new) related to the agreed quantity between the two parties, to complete the construction. At the same time, Quang Anh Electrical Construction Company Limited has converted underground cable connection columns using a 6-compartment RMU cabinet, the number of RMU compartments as required by Gia Dinh Electricity Company, with a backup of 1 compartment for Viet Shop substation.

In addition, the project also includes the construction and relocation of the 400KVA 22/0.4kV substation, installation of low voltage power supply cabinets for lighting grid and customer branches, undergrounding of 0.4kV customer branches along the road to ensure aesthetics. At the same time, the materials and equipment of the old connection pillars have been dismantled and returned to Gia Dinh Electricity Company.

The project commenced on September 16, 2022 and was completed on September 27, 2022.

Quang Anh Electrical Construction Company Limited has completed all procedures and requests for electricity supply from Gia Dinh Electricity Company until the project is electrified and put into use. The project commenced on September 16, 2022 and was completed on September 27, 2022.

transformer substation relocation

Continuous operation of a generator for 8 hours to provide power supply to the residential area in alley 600 Dien Bien Phu

This medium and low voltage electricity grid upgrade project has significantly contributed to improving the quality of power grid infrastructure, as well as enhancing the urban aesthetics, creating favorable conditions for production, business activities, and the daily lives of residents in this area.

Quang Anh Electrical Construction Company Limited is one of the leading units in designing, constructing, and upgrading medium and low voltage electricity grids in Vietnam. With a team of highly specialized engineers and technicians, rich practical experience, and professionalism in each step of implementing projects, we have been and are highly appreciated by customers for the quality of service and project progress.

transformer substation relocation
Pulling underground cable line 3x240mm2 connecting to the RMU cabinet

The project to upgrade the medium and low voltage electricity grid and relocate the 4 400KVA road lighting substation at 600 Dien Bien Phu, Ward 22, Binh Thanh District, Ho Chi Minh City is one of the typical projects that our company has successfully completed.

The project was initiated in response to the growing demand for reliable and stable electricity supply in the area. With the goal of providing high-quality services and meeting the needs of customers, our company took on the task of upgrading the existing infrastructure and relocating the road lighting substation.

The project required a comprehensive approach, involving various stages of planning, design, construction, and testing. Our team of highly skilled engineers and technicians worked closely with the local authorities and other stakeholders to ensure that the project was completed within the designated timeframe and budget.

During the implementation process, our team faced a number of challenges, including complex technical requirements, tight deadlines, and logistical issues. However, through effective communication, collaboration, and problem-solving, we were able to overcome these obstacles and deliver the project successfully.

The upgraded medium and low voltage electricity grid and the relocated substation have significantly improved the electricity supply in the area, providing customers with a more stable and reliable source of power. In addition, the new road lighting substation has enhanced the safety and visibility of the surrounding streets, contributing to a more secure and comfortable living environment for the local community.

We always prioritize the criteria of “Reputation – Quality – Progress” to bring customers absolute satisfaction and trust

transformer substation relocation

Overall, the project to upgrade the medium and low voltage electricity grid and relocate the road lighting substation at 600 Dien Bien Phu is a testament to our company’s commitment to delivering high-quality services and contributing to the development of the local community. We are proud to have played a role in this important infrastructure project and look forward to continuing to serve our customers in the years to come.

We are committed to ensuring safety and aesthetics for the power grid, urban landscaping, and providing the most advanced and effective technical solutions to solve complex technical problems.

With experience and professionalism in every step of project implementation, we are committed to meeting all customer needs and requirements at the most competitive prices in the market. Especially, we always prioritize the criteria of “Reputation – Quality – Progress” to bring customers absolute satisfaction and trust.

If you need advice or have a need for relocating transformers, constructing and installing electrical systems, building various types of substations, please contact us via our Hotline: 0919758191 for the best consultation and support.

1- Main materials used in the project:

  • Steel support post for 400kVA MBA transformer (Square post):

transformer substation relocation

  • Post dimensions 900Wx600Dx3000H, 5mm hot-dip galvanized sheet steel according to Ho Chi Minh City Power Corporation standards.
  • Transformer support plate, 5mm hot-dip galvanized sheet steel.
  • Covering ring for 400kVA transformer, 2.0mm hot-dip galvanized sheet steel.
  • Door dimensions 1080Hx650W, 2.0mm hot-dip galvanized sheet steel.
  • Fixed foundation bolts (Bolt D18)
  • Accompanying installation accessories.

 

transformer substation relocation

  • The door is made of 2.0mm hot-dipped galvanized steel with dimensions of 1080H x 650W.
  • The foundation bolts are fixed with D18 bolts.
  • The accompanying installation accessories.
  • The RMU cabinet shell measures 2000 x 2700 x 1350, made of 2.0mm standard steel sheet with RAL 7032 color.

transformer substation relocation

3- MEDIUM VOLTAGE RMU CABINET TYPE +KKT+KKV+, 24kV 20kA, 3s, IAC AFLR

  • Configuration:
  • KKT: 3-function cabinet – 2 LBS 630A load break switches and 1 630A load break switch with LBSF fuse.
  • KKV: 3-function cabinet – 2 LBS 630A load break switches and 1 VCB circuit breaker.

transformer substation relocation

  • Technical specifications:
  • Indoor installation, operated manually
  • Expandable on both sides
  • Voltage 24kV, Busbar 630A
  • Short-circuit current withstand capacity 20kA/3s
  • Internal arc withstand capability: 4 surfaces AFLR 20kA/s

transformer substation relocation

Load Break Switch (LBS) compartment: Cable In/Out (symbol K)

  • SF6 insulation
  • Voltage Presence Indicator (VPIS)
  • 3-position LBS load break switch 630A
  • Fault Indicator (FI)
  • 220VAC 50W Heater

transformer substation relocation

Load Break Switch – Fuse cubicle (symbol T)

  • SF6 insulation
  • VPIS voltage presence indicator
  • 630A load breaking switch
  • 80A fuse chamber
  • Grounding on both sides of the fuse chamber
  • Horizontal fuse chamber integrated in SF6 tank
  • 24kV high voltage fuse (Mersen/Hungary) up to 40A suitable for the load

transformer substation relocation

VCB compartment (designated as V)

  • SF6 insulation
  • VPIS voltage indicator light
  • 630A DS isolation switch
  • 200A VCB cutting machine.

transformer substation relocation

  • Vacuum (or “Gas”) insulated switchgear
  • SF6 insulated switchgear
  • Relay 50/51; 50N/51N
  • External power supply 24VDC
  • Current transformers (CTs) 600/1A 5P20
  • 220VAC 50W heating unit

transformer substation relocation

4- Circuit breaker equipment

MCCB ABN803c 3P 630A 45kA

MCCB ABN203c 3P 250A 35kA

transformer substation relocation

5- Various types of medium and low voltage power cables

CXV/SE/DSTA cable – 3Cx50mm2 – 24kV

CXV/SE/DSTA cable – 3Cx240mm2 – 24kV

CXV/DSTA cable – 3×95+1x50mm2 – 0.6/1kV

CXV/DSTA cable – 3×50+1x35mm2 – 0.6/1kV

CXV/DSTA cable – 3×10+1x6mm2 – 0.6/1kV

C50 overhead copper cable

CVV cable – 4x4mm2

CV cable – 300mm2

transformer substation relocation

Pulling 3x240mm2 medium voltage underground cable

6- Cable heads, underground cable joints

Low-voltage cable head 1kV, 4 phases 25-70mm2 (Code: EPKT-0031-(S10))-(PK7).

Outdoor heat-shrinkable cable head 24kV 3Cx50mm2

24kV underground cable joint, Tee type, 3 phases, 800A, 35-70mm2 (Code ELBC-824-3570-SC)- PK4

24kV underground cable joint, Tee type, 3 phases, 800A, 150-240mm2 (Code ELBC-824-1524-SC)- PK4

transformer substation relocationUnderground cable head installationLow voltage 1kV 4-core 50-70 mm2 cable joint box (Code EPKJ-0249(S5)) – (PK3).

24kV 3-phase cable joint box, cool-pouring type, for single-phase cables 240-300mm2 (CSJM-T-24C/3XU-3XU).

transformer substation relocation

Installation of 3x240mm2 medium voltage underground cable joint box

7- HDPE pipes for underground electrical cables

OSPEN corrugated pipe 100/130

OSPEN corrugated pipe 100/130

transformer substation relocation

8- Other materials

  • 9-pole distribution box
  • Bekelite plastic sheet
  • MBA 400kVA cover cap
  • Copper cose head 300mm2
  • 16×2400 copper plated grounding post
  • 4/0 cable tightener screw
  • Cadweld welding compound

transformer substation relocation

Installation of RMU grounding welding

QUANG ANH CE CO.,LTD

Office: 41F/22 Dang Thuy Tram Street, Ward 13, Binh Thanh District, Ho Chi Minh City, Vietnam

Hotline: 0919758191

Email: sales@quanganhcgte.com

Website: quanganhcgte.com –  Youtube channel: Quanganhcons 

Tax code: 0316365712