Becamex Infrastructure Investor
Becamex – VSIP Power Investment and Development Joint Stock Company is the main investor for large projects at Becamex Industrial Park. In projects like the 110/22kV substation at VSIP 3, Becamex – VSIP plays an important role in the development of electric infrastructure in this area. The investment and development by this company is a testament to Becamex’s long-term development strategy in the electricity sector.
Becamex is one of the leading organizations contributing to the development of industrial and urban infrastructure in Vietnam. With over 30 years of experience, Becamex IDC and Becamex IJC have asserted their position through the development of integrated industrial parks and modern transportation infrastructure.
Becamex IDC is currently managing and developing more than 21 integrated industrial parks nationwide. With a strategic vision, Becamex has pioneered the model of an industrial park combined with a science and technology urban area, creating a sustainable development environment. Becamex’s network of industrial parks extends across 15 provinces and cities, making a significant contribution to urban planning and local economic development.
In addition, Becamex IJC, with a land fund of up to 1.2 million m², optimizes resources to deploy a series of large projects in the field of transportation infrastructure. Highlights include the BOT National Highway 13 project and the Ho Chi Minh City – Thu Dau Mot – Chon Thanh highway, creating a strategic traffic channel connecting key economic regions.
In the field of industrial and urban real estate, Becamex – Binh Phuoc Technical Infrastructure Development Joint Stock Company has pioneered the development of multi-sector complex industrial parks. With a comprehensive industrial ecosystem model, this area covers up to 4,633 hectares, including more than 2,448 hectares of multi-sector industrial parks, meeting the needs of a rapidly developing economy.
Becamex is committed to accompanying socio-economic development not only in Binh Duong province but also nationwide. This corporation owns and operates a network of member businesses across various fields, from healthcare, education, telecommunications to energy, contributing to local economic growth.
Major projects like BOT National Highway 13 and the Ho Chi Minh City – Thu Dau Mot – Chon Thanh highway, along with industrial parks in Binh Phuoc and Binh Duong, demonstrate Becamex’s capabilities and influence in sustainable development and the expansion of industrial infrastructure.
Main Electrical Construction Contractor

Main electrical construction contractor is one of the key factors determining the success of construction projects related to electrical systems. With tasks from design, material supply, installation, to acceptance and handover, the main contractor ensures the system operates efficiently and safely according to strict technical standards. This is especially important in industrial electrical construction and main construction contracting for large-scale electrical projects.
- Construction of power and lighting systems: Includes complex tasks such as medium-voltage electricity, substations, underground cables and urban lighting systems. All are performed based on high technical standards to ensure safety and effective use.
- Installation of electrical cabinets: From medium and low voltage cabinets to control cabinets, ATS cabinets, and MDB cabinets, all must meet IEC electrical safety standards. This is an indispensable part of the power systems of many large projects.
- Construction of HVAC systems: Ensures optimal working and living environments with high technical requirements. This system not only helps maintain an ideal temperature but also directly affects operating and maintenance costs.
- Application of BIM technology: The use of BIM, REVIT 3D has become an inevitable trend in electrical project management, optimizing construction progress and saving costs. This technology helps save time, reduce errors, and increase accuracy during the construction process.
- Technical consulting, design and maintenance: Helps operate the electrical system stably, save energy, and minimize environmental impact. This is a key factor that any main electrical construction contractor must focus on.
Main electrical construction contractor not only involves regular construction tasks but also requires a team of experienced engineers and technical workers. They are capable of handling complex projects from residential, commercial to industrial. In addition, compliance with quality management standards such as ISO 9001:2015 is indispensable. Notably, the main electrical construction contractor must know how to flexibly coordinate MEP (Mechanical, Electrical, Plumbing) items to ensure that progress and budget are strictly adhered to.

Investment and Development of Substations
The 110kV Binh Phuoc substation project in Becamex Industrial Park is a typical example of strong investment with a budget of 66.3 billion VND. Although the main contractor is not clear, units of the Southern Power Corporation are often responsible for important parts. This reflects the strategic intention in the development of electric infrastructure in this important industrial area.
Investment and development of substations is a core element in Vietnam’s electric infrastructure development strategy, aimed at ensuring energy security and enhancing transmission capacity. According to Power Development Plan VIII, from 2021-2030, the plan is to build approximately 49,350 MVA 500kV substations and 12,300 km of lines, with a total budget of up to 14.9 billion USD. New substations not only enhance transmission capacity but also help reduce the load on existing stations, ensuring the N-1 criterion, reducing power loss, and improving economic efficiency.
Prominent projects such as the 220kV Phuoc Dong Substation and the 500kV Binh Dinh Substation demonstrate the important role of these projects in stabilizing the national power system. These stations also contribute to transmitting electricity from renewable energy sources to the grid. In addition, Vietnam has made significant progress in technology localization, as evidenced by the successful design and manufacture of the largest capacity 500kV transformer on the transmission grid by domestic enterprises.
Every year, Vietnam invests approximately 1.5 billion USD to complete its transmission grid system, particularly 220-500kV lines. Policies from the amended Electricity Law effective from 2025 promise to create favorable conditions for privatization, helping diversify investment sources and improve efficiency.
Substations, acting as reception and distribution points for electricity from new energy sources such as solar and wind power, ensure the sustainable development of the energy sector, supporting socio-economic development in key areas.
Projects for substations at Becamex Industrial Park bring outstanding technical and strategic benefits, from enhancing industrial park electric infrastructure to increasing the effective supply of electric power. The coordination between investors, main contractors, and consultants has created a solid foundation for the future development of the area.
For more in-depth information on substation construction and electric infrastructure services, contact QuangAnhcons via Hotline: +84 9 1975 8191.

QuangAnhcons specializes in providing construction and development services for substation systems, ensuring quality and efficiency for industrial projects in the Becamex area.
Substation budget estimate
Select the capacity, route lengths and package to view your indicative budget and electrical parameters.
Request a project quotation
Send your project details, BOQ or drawings to request a formal quotation. Fields marked * are required.
Quotation scope
Applies to one EVN-supplied substation with oil-immersed transformers at 22/0.4 kV (single-phase: 12.7/0.23 kV), with MV metering VTs/CTs supplied by EVN. The estimate includes the selected equipment, installation, earthing, transformer-to-main-breaker connections, design and connection documentation, and coordination of testing and utility acceptance.
Kiosk, integrated steel-pole and indoor substations include MV switchgear and the entered underground cable route. Other outdoor arrangements use the relevant protection configuration. The final diagram must meet the project connection requirements.
Excludes VAT, cables from the substation switchboard to the MSB/loads, live-line work, harmonic reactors, weak-ground treatment or special piling, land and special fire-protection provisions. Underground routes assume normal construction conditions and exclude road drilling and special reinstatement.
Prices are indicative investment budgets. A formal quotation follows site assessment and agreement on the configuration. Electrical selections are preliminary and require design verification before installation.
Capacity range and application conditions
The catalogue defines the enquiry range of this tool, not universal TCVN capacity limits. Single pole-mounted transformers: 15–100 kVA; three-unit banks: 3×15–3×100 kVA. Platform substations: 100–630 kVA. Steel-pole substations: 100–630 kVA; 750/800 kVA require design verification and local approval. Ground-mounted, kiosk and indoor configurations: 50–10,000 kVA. Not every configuration has a package price or the same structural design.
Reference: EVN Decision 1299/QD-EVN dated 3 November 2017, Volume 1, sections 3.3–3.4. Check the current requirements of the responsible utility before implementation. Kiosks must meet manufacturer ratings and testing requirements (IEC 62271-202); indoor and ground-mounted arrangements must meet project layout, ventilation, structural and fire-protection requirements. For multiple transformers, specify the quantity and capacity of each unit.