Construction of Factory Transformer Stations: Process and Benefits


The construction of a transformer station for a factory involves design, construction, and installation of electrical systems to meet production needs, including steps from survey to regular maintenance.

Preparation and Design of Transformer Stations: Overall Process

The preparation and design stage is the first step in constructing a factory transformer station, involving site surveys, detailed technical designs, and preparation of materials to ensure everything is ready before starting building and installation.

Site Organization and Logistics

In the process of constructing transformer stations, the organization of the site plays a crucial role in optimizing costs and time. Firstly, ensure the construction site is spacious enough for efficient work deployment. Site preparation involves providing adequate electricity and water conditions and arranging labor flexibly according to work volume. Using local materials like sand and stone helps minimize transportation costs.

Transportation of Equipment

The equipment transportation process is divided into two main methods:

  • Mechanical: Cables, transformers (TFR), bars, and insulators are important equipment transported by truck to a closed warehouse area at the site.
  • Manual: Utility poles and small materials are moved by simple means or manually to ensure safety and cost savings.

Technical Design

The construction of transformer stations must be based on detailed technical designs, including schematic diagrams of main equipment according to grid connection requirements. Detailed drawings help determine dimensions for supports, cable routes, and cable connection methods.

Detailed Drawings

  • Support dimensions: Important for determining elevation, location of transformer installation, and auxiliary equipment.
  • Cable route: Shows the route, elevation, ensuring accuracy in equipment connections.
  • Installation accessories: Details about types of bolts, brackets, and assembly diagrams are extremely necessary.

Equipment Preparation

Before installation, thorough inspections through catalogs and materials are necessary. Ensure that the equipment’s technical specifications, such as rated voltage and current, match the placed order.

Construction Process

  1. Excavate holes, bury foundations: Creating foundations for electric poles and transformer support is the first important step.
  2. Install steel frames: Use jacks to place the transformer on the steel frame safely and stably.
  3. System connection: Ensure accurate electrical cable connections, distribution cabinet installations, and measurement devices.

Labor Safety

In the construction process of transformer stations, labor safety is always prioritized. Staff must comply with PPE regulations and check grounding, insulation systems of transformers before operation.

Required Documents

Necessary documents include legal records like connection request forms and approved schematic diagrams. Additionally, the installation manual from the manufacturer is an important information source.

Technical standards TCVN and IEC for medium voltage electricity must be strictly followed to ensure overall quality and safety of the transformer station.

Transformers station design with detailed diagrams inside the factory.
Design diagram of the transformer station ensuring space optimization and efficiency.

Building Infrastructure for Transformer Stations

The infrastructure construction process includes excavating foundations, installing grounding systems, and pouring concrete foundations to create a solid foundation, as well as installing underground protective conduits for the safe electrical system.

Building infrastructure for the transformer stations involves a detailed and thorough process to ensure electrical safety and operational efficiency. It starts with surveying and identifying the location, where factors like pole foundation and medium voltage underground cables are carefully selected to avoid impacting roads and residential areas. Site preparation tasks include excavating holes, building foundations, provided sufficient electricity and water for construction, and ensuring effective transportation of materials and equipment to the site.

One crucial step in this process is installing the grounding system, which determines the electrical safety of the entire project. This system is implemented by creating grounding electrodes spreading the lightning current, helping to avoid lightning strike risks.

Then, pouring the transformer station concrete foundation helps create a stable base for the transformer, ensuring stability during the operation process. Electrical devices such as circuit breakers, operation stools, bars, insulators will be erected to ensure efficiency in controlling the electrical flow. The installation process of the transformer requires precision when using a crane to place the transformer in the correct position.

Installing medium voltage underground cables is also an indispensable part, playing a role in connecting the transformer station to the power source, safely and efficiently transmitting electricity. Connecting the transformer station to the existing electrical system must be done carefully to ensure a safe connection.

Finally, the process of testing, adjustment, acceptance, and trial run is conducted to check the entire system, ensuring everything works smoothly before handing over to the customer.

The factor of labor safety is always a top priority along with the standard of quality equipment and compliance with technical regulations throughout this process.

Workers building the foundation for a factory transformer station.
Process of building the foundation and securely installing underground conduits.

Installing Equipment for Transformer Stations

The equipment installation phase includes erecting circuit breakers, operation stools, and placing transformers in positions using cranes to ensure electrical safety and effective operation of the system.

  1. Site preparation and documentation: Thorough field surveys to determine optimal positions for transformer station foundations, underground cable routes, and the grounding system. Ensure the completion of all necessary legal procedures, including installation registration records and schematic diagrams. The site must be organized tightly, from electricity and water supply to labor arrangement.
  2. Foundation and auxiliary system construction: Conduct excavating and installing protective tubes with precise positions according to approved designs. The grounding system must be constructed following electrical safety standards, then pour concrete foundations with standard materials to secure the equipment.
  3. Installing main equipment and accessories: The transformer must be moved and placed on the prepared foundation, noting to check balance and mechanical connections. Install cutting devices such as circuit breakers, operational stools, supportive bars with insulator accessories. Medium voltage cables are routed through underground conduits, making sure they are not twisted or damaged in insulation.
  4. Connection and trial operation: Electrically connect the transformer to the grid system and auxiliary devices. Place warning signs and station nameplates according to safety regulations. Conduct tests and calibrations on operational parameters such as grounding resistance and idle current.
  5. Acceptance and handover: Final check to ensure everything is executed correctly, cable trenches covered and cleaned. Measure environmental parameters such as temperature and humidity within allowable limits. Electricity is switched on, and no-load running is done before handing over to the management unit.

Technical notes:

  • Strictly comply with electrical safety and lightning protection standards.
  • Use certified quality materials such as cables from reputable brands: Cadivi, LS, Eaton, Schneider.
  • Conduct regular maintenance work, including checking grounding systems and transformer oil to maintain stable operations.
Installing transformers in the factory.
Workers installing transformers with modern equipment.

Connecting and Testing the Electrical System

After installing the equipment, the process of laying out medium voltage cables and connecting the transformer station takes place, followed by testing, calibrating, and accepting to ensure the system operates accurately and safely before operation.

In the electrical system engineering field, testing electricity is a vital step to ensuring performance, safety, and the lifespan of equipment before being put into use. This process checks aspects such as insulation, load capacity, and system operational efficiency.

  • Insulation resistance test: Measure the insulation capability of the equipment to detect the potential for current leakage, ensuring system safety.
  • Partial Discharge (PD) Testing: Aims to detect partial discharges in insulation cores, protecting the equipment from unexpected losses.
  • Hi-Pot Test: Tests the equipment’s ability to withstand high voltage to ensure safety and prevent the risk of fire and electric shock.
  • Ratio tests: Conducted on transformers and current transformers to determine equipment accuracy, contributing to grid stability.
  • Ground resistance measurement: Assess the effectiveness of the grounding system, an important part of lightning protection and electrical stability.

System connection process

The connection and testing process of the electrical system is performed according to Decision 25/QĐ-ĐTĐL (2019). The main steps include:

  • AGC (Automatic Generation Control) connection: Verify the local and remote control status through the SCADA/EMS system to ensure consistency in operations and quickly detect incidents.
  • FRS connection: Ensure compatibility and reliability of the load dispatching system as well as record in the regulated form, ensuring a professional and accurate acceptance process.

Applicable devices

The testing process applies to devices such as:

  • Transformer/CT/PT: Check core characteristics and coil resistance to ensure the equipment operates per design requirements.
  • Capacitor bank: Measure current, reactive power, and check connection points, optimizing performance and reducing electricity losses.
  • Grounding system: Evaluate mechanical durability and earth resistance to ensure safety for the electrical system.

Purpose and standards

The testing process not only ensures operational safety, minimizes fire risk but must also comply with legal standards like IEC 62271 and TCVN 3715. These standards provide a solid foundation to optimize performance and ensure load balancing and grid stability.

Legal reference documents

Reference documents include important standards and decisions such as Decision 25/QĐ-ĐTĐL (2019), IEC 62271, and TCVN 3715, guiding testing activities and ensuring this process follows the law.

Technicians testing transformer station electrical system.
Testing and calibrating the electrical system after installation.

Notes and Equipment Safety for Transformer Stations

Finally, installing nameplates and warning signs to clearly inform the position and danger of the transformer station combined with regular maintenance ensures long-term safety and stable operation.

Transformer stations play a crucial role in the power system, transforming voltages to distribute electricity to different regions. To ensure transformer station safety during operation and maintenance, complying with specific measures is absolutely necessary.

Notes

The notes related to the transformer stations include important contents such as:

  • Maintenance history: This record monitors all maintenance and inspection activities of the system to maintain equipment performance.
  • Operational procedures: Details steps to be taken before, during, and after operations, thereby optimizing operational efficiency.
  • Incident reports: Document any incidents that occur, along with timely remedial solutions.

Safety Equipment

In transformer stations, safety is paramount, with the role of electrical protective equipment and workplace environmental protection as follows:

  1. Safety Equipment for Personnel:
  • Protective clothing: Such as reflective vests, safety boots, and specialized goggles.
  • Protective equipment: Use rubber gloves, gas masks to prevent potential hazards.
  1. Electrical Equipment:
  • General circuit breakers: This equipment must always be ready to cut the entire power in necessary cases.
  • Electrical network diagram: Providing detailed diagrams helps easier tracking and control.
  • Protective equipment: Transformers and current transformers must be properly grounded to prevent electrical fires and explosions.
  1. Protection of the Working Environment:
  • Electrical fire prevention: Place fire extinguishers in accessible positions, combined with automatic fire alarm systems.
  • Ventilation: Especially in rooms containing devices like batteries, maintaining ventilation to avoid gas poisoning is necessary.
  1. Technical Regulations:
  • Compliance with regulations: Follow regulations such as Circular 38/2019/TT-BCT to meet the highest safety standards.

For Temporary Electric Works

  • Electrical cabinet arrangement: Should be placed in a dry place or high up to avoid moisture.
  • Full grounding: Ensure grounding to minimize the risk of electric shock.

Working with Battery Systems

  • Wear protective clothing: Use specialized clothing and gloves when exposed to acids and alkalis.
  • No fire and smoking: Stay away from battery storage areas to prevent fire hazards.
  • Ventilation: The battery room must have a ventilation system to prevent toxic gas accumulation.
Transformer station with nameplate and warnings.
Safety equipment and warning signs surrounding the transformer station.

Factory transformer station construction ensures stable and safe energy provision for production activities, offering superior technical benefits and optimizing long-term investment.

For factory transformer station construction projects, contact QuangAnhcons via phone at +84 9 1975 8191 for detailed consultation.

QuangAnhcons provides professional factory transformer station construction services, including from technical design to installation and periodic maintenance, ensuring effectiveness and safety for clients.

QUANGANHCONS

Tính nhanh giá trạm biến áp

Chọn công suất và chiều dài tuyến để xem giá tham khảo cùng thông số điện.

01   Tính giá nhanh

Điều kiện tính cáp và tụ bù
Gửi yêu cầu báo giá theo thiết kế

Gửi thông tin công trình, BOQ hoặc bản vẽ để nhận báo giá chính thức. Các trường có * là bắt buộc.

Cấu hình tính nhanh gửi kèm
Chưa có kết quả tính nhanh. Bạn vẫn có thể gửi yêu cầu theo thiết kế.

Phạm vi báo giá

Áp dụng cho một trạm mua điện EVN, máy dầu 22/0,4 kV (máy một pha: 12,7/0,23 kV), TU/TI trung thế do EVN cấp. Giá gồm thiết bị theo cấu hình, lắp đặt, tiếp địa, liên kết máy–CB tổng, hồ sơ thiết kế–đấu nối và phối hợp thí nghiệm, nghiệm thu điện lực.

Kios, trụ thép hợp bộ và trạm trong nhà có tủ trung thế cùng đoạn cáp ngầm theo thông tin đã nhập. Các kiểu ngoài trời dùng phương án bảo vệ tương ứng; sơ đồ cuối cùng cần phù hợp yêu cầu đấu nối tại công trình.

Chưa gồm VAT, cáp từ tủ trạm đến MSB/phụ tải, hotline, cuộn kháng lọc hài, nền yếu/cọc đặc biệt, đất và PCCC đặc thù. Tuyến ngầm tính theo điều kiện thi công thông thường, chưa gồm khoan qua đường hoặc hoàn trả đặc biệt.

Giá dùng để tham khảo đầu tư. Báo giá chính thức được xác nhận sau khảo sát và thống nhất cấu hình. Thông số điện là lựa chọn sơ bộ, cần kiểm tra theo thiết kế trước khi thi công.

Dải công suất và điều kiện áp dụng

Danh mục là phạm vi tiếp nhận yêu cầu của công cụ, không phải giới hạn công suất chung của TCVN. Trạm treo một máy: 15–100 kVA; bộ ba máy: 3×15–3×100 kVA. Giàn: 100–630 kVA. Trụ thép: 100–630 kVA; 750/800 kVA cần xác nhận thiết kế và chấp thuận tại địa phương. Nền/kios/phòng: danh mục 50–10.000 kVA, không có nghĩa mọi cấu hình đều có giá trọn gói hoặc cùng kết cấu.

Tham khảo QĐ 1299/QĐ-EVN ngày 03/11/2017, Tập 1, mục 3.3–3.4; kiểm tra văn bản hiện hành của điện lực quản lý trước khi triển khai. Kios phải phù hợp định mức/thử nghiệm của nhà chế tạo (IEC 62271-202); phòng/nền phải đáp ứng bố trí, thông gió, kết cấu và PCCC của dự án. Công suất trạm nhiều máy phải tách số máy và công suất mỗi máy.

Công cụ do QuangAnhcons phát triển · © 2026 QuangAnhcons. Mã nguồn theo GPL-2.0-or-later; tiêu chuẩn và dữ liệu hãng thuộc chủ sở hữu tương ứng.

Yêu cầu báo giá chi tiết / gửi BOQ, bản vẽ
Nhận báo giá chi tiết và lịch khảo sát hiện trường

Quý khách vui lòng gửi thông tin dự án, BOQ hoặc bản vẽ. QuangAnhcons sẽ kiểm tra và phản hồi trong ngày hoặc chậm nhất trong vòng 48 giờ làm việc.

1. Thông tin liên hệ

Thông tin này giúp QuangAnhcons phản hồi nhanh qua điện thoại, Zalo hoặc email.

Email công ty được ưu tiên để QuangAnhcons xác minh thông tin và phản hồi báo giá chuyên nghiệp hơn. Email cá nhân có thể cần xác nhận thêm.
2. Địa điểm / tiến độ công trình

Cung cấp địa điểm, mức độ cần báo giá và tiến độ hoàn thiện để ưu tiên xử lý đúng nhu cầu.

3. Nguồn điện / điều kiện triển khai

Các thông tin nền dùng chung để báo giá sát hơn trước khi vào mục kỹ thuật riêng theo dịch vụ cha/con.

Thông tin này giúp QuangAnhcons tính mùa thi công, mưa gió, tiến độ và bố trí khảo sát phù hợp.
4. Dịch vụ / thông tin dự án

Chọn đúng hạng mục để QuangAnhcons phân luồng sales kỹ thuật và báo giá sát hơn.

5. Thông tin kỹ thuật chính

Nhập đủ công suất, số lượng MBA, kiểu trạm, khoảng cách điểm đấu nối và kiểu đấu nối trung thế để Quang Anh kiểm tra báo giá sơ bộ nhanh. Không lặp lại cấp điện áp và nguồn mua điện vì đã có ở mục Nguồn điện.

Mục kỹ thuật riêng cho: Nâng công suất trạm biến áp
Mục kỹ thuật riêng cho: Di dời / cải tạo trạm biến áp
Mục kỹ thuật riêng cho: Bảo trì/ Bảo dưỡng trạm biến áp
Mục kỹ thuật riêng cho: Xử lý sự cố trạm biến áp
Mục kỹ thuật riêng cho: Sửa chữa máy biến áp
Mục kỹ thuật riêng cho: Thi công hệ thống cáp ngầm trung thế
Mục kỹ thuật riêng cho: Thi công đường dây trung thế nổi
Mục kỹ thuật riêng cho: Thi công ngầm hóa đường dây trung/hạ thế

Các thông tin nâng cao giúp giảm sai số khi báo giá trạm biến áp. Có thể bỏ qua nếu chưa rõ.

7. BOQ / bản vẽ / tài liệu đính kèm / hình ảnh liên quan

Đính kèm BOQ, bản vẽ, hình ảnh hiện trạng hoặc gửi link file lớn an toàn để QuangAnhcons kiểm tra nhanh.

Một vùng upload chung cho BOQ, bản vẽ, tài liệu, ảnh hiện trạng, ảnh điện thoại, CAD/BIM và file nén. Có thể chọn nhiều file, chọn thêm file lần nữa để bổ sung, bấm Xóa để bỏ từng file trước khi gửi.
Chỉ hiện cho form thi công trọn gói trạm biến áp. Có thể chọn ảnh JPG/PNG/HEIC/WebP hoặc PDF/CAD liên quan.
Chỉ hiện cho form thi công trọn gói trạm biến áp. Nên gửi ảnh mặt bằng, vị trí đặt trạm, lối xe cẩu và khoảng cách đến điểm đấu nối.
8. Nội dung yêu cầu / ghi chú thêm

Ghi rõ yêu cầu đặc biệt, mốc tiến độ, hãng thiết bị mong muốn hoặc phạm vi cần tách giá.

Nội dung đã nhập sẽ được giữ lại sau khi gửi cho đến khi tải lại trang.