Binh Phuoc attracts 9 more FDI projects – Quanganhcons

Binh Phuoc attracts 9 more FDI projects

In the first quarter of this year, Binh Phuoc attracted 9 more foreign-invested projects with a registered capital of $30 million.

Previously in 2021, the province attracted 63 FDI projects with a capital of $514 million, up 88.5% in the number of projects and triple the capital compared to 2020. Up to now, there have been 346 FDI projects registered in the province with a total capital of more than $3.579 billion, according to the General Statistics Office.

Binh Phuoc’s leaders stated that with the foundation of ‘4 goods’ including infrastructure, labor, policies, and public services, the province always welcomes and welcomes investors to come and invest.

“The province always stands side by side and accompanies businesses; listens, shares, and resolves difficulties for businesses; creates favorable conditions for businesses to invest in production and business in the homeland of Binh Phuoc,” said Tran Tue Hien, Deputy Secretary of the Provincial Party Committee, Chairman of the Provincial People’s Committee.

The province is currently mobilizing all resources to invest in developing modern and synchronized technical infrastructure; building a transportation system connecting regions and provinces; promoting planning and investing in the development of industrial parks, border economic zones. In addition, the locality is also promoting online investment; strengthening administrative procedure reform, publicizing the process of handling work in all agencies and units; strengthening meetings, contacts with associations and businesses to timely resolve difficulties for enterprises.

Thanks to that, from a province with a focus on agricultural products until now, Binh Phuoc has more garment products, electronic components, plywood, mechanical processing…

According to experts, Binh Phuoc is quickly moving from a development reserve position to a driving force for development.

During his visit and working trip to Binh Phuoc province on March 20th, Prime Minister Pham Minh Chinh praised the province’s policies to attract investment. The Prime Minister suggested that the province should focus on developing technical infrastructure projects to enhance its attractiveness to more businesses and investors. He also emphasized the importance of having a certain “filter” when attracting projects, particularly those that have strategic significance, prioritize social welfare, and provide good living conditions for workers, social housing, healthcare infrastructure, and cultural activities for laborers. Moreover, the Prime Minister emphasized the need to apply maximum measures to protect the environment.

Binh Phuoc is located in the key economic region in the South, with convenient transportation infrastructure and connectivity to Ho Chi Minh City and other provinces in the Southeast through National Highway 13, 14, and DT741, which have been invested in and completed with a scale of 6 to 8 lanes. The province has 15 industrial parks covering a total area of over 4,686 hectares and 8 industrial clusters covering an area of 380 hectares. In addition, the province has the Hoa Lu International Border Economic Zone, which borders Cambodia and has convenient transportation connections to Laos and Thailand.

Quanganhcons – General contractor for industrial plant construction  

Quanganhcons is a leading construction and engineering company in VN, providing a wide range of services including industrial plant construction, electrical system installation, and solar power solutions. With a team of experienced engineers and technicians, Quanganhcons is committed to delivering high-quality projects that meet customer demands and top quality standards. The company’s mission is to provide customers with the most optimal solutions, utilizing professionalism and advanced technology to create maximum value. Quanganhcons always puts customers at the center of the service delivery process and strives to ensure the stable and sustainable operation of all projects.

As one of the leading contractors in Vietnam, we provide our customers in factories, residential areas, industrial zones, high-rise buildings, and apartments with electrical systems, transformer substations, and industrial electrical boards that meet high technical standards and precise specifications.
Our quality policy is based on providing genuine materials and equipment with full CO and CQ certificates, maintaining high accountability and timely project completion, using innovative construction techniques to adapt to each project’s unique characteristics, and always being ready to provide enthusiastic support and address customer concerns. Our pricing is competitive, ensuring the highest economic efficiency for the investor. Our entire leadership and staff are committed to implementing these quality policies. Please contact us for the best support for any of the above services.
Quang Anh looks forward to working with you!.

Quanganhcons

Office:Unit 02, 08th floor, Pearl Plaza Building, 561A Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City, Vietnam

Hotline: 0919758191

Email: sales@quanganhcgte.com

Website: quanganhcgte.com –  Youtube channel: Quanganhcons

Tax code: 0316365712

 

QUANGANHCONS

Substation budget estimate

Select the capacity, route lengths and package to view your indicative budget and electrical parameters.

01   Quick estimate

Cable and power-factor correction conditions
Request a project quotation

Send your project details, BOQ or drawings to request a formal quotation. Fields marked * are required.

Reference quick estimate
No quick estimate yet. You can still submit a project quotation request.

Quotation scope

Applies to one EVN-supplied substation with oil-immersed transformers at 22/0.4 kV (single-phase: 12.7/0.23 kV), with MV metering VTs/CTs supplied by EVN. The estimate includes the selected equipment, installation, earthing, transformer-to-main-breaker connections, design and connection documentation, and coordination of testing and utility acceptance.

Kiosk, integrated steel-pole and indoor substations include MV switchgear and the entered underground cable route. Other outdoor arrangements use the relevant protection configuration. The final diagram must meet the project connection requirements.

Excludes VAT, cables from the substation switchboard to the MSB/loads, live-line work, harmonic reactors, weak-ground treatment or special piling, land and special fire-protection provisions. Underground routes assume normal construction conditions and exclude road drilling and special reinstatement.

Prices are indicative investment budgets. A formal quotation follows site assessment and agreement on the configuration. Electrical selections are preliminary and require design verification before installation.

Capacity range and application conditions

The catalogue defines the enquiry range of this tool, not universal TCVN capacity limits. Single pole-mounted transformers: 15–100 kVA; three-unit banks: 3×15–3×100 kVA. Platform substations: 100–630 kVA. Steel-pole substations: 100–630 kVA; 750/800 kVA require design verification and local approval. Ground-mounted, kiosk and indoor configurations: 50–10,000 kVA. Not every configuration has a package price or the same structural design.

Reference: EVN Decision 1299/QD-EVN dated 3 November 2017, Volume 1, sections 3.3–3.4. Check the current requirements of the responsible utility before implementation. Kiosks must meet manufacturer ratings and testing requirements (IEC 62271-202); indoor and ground-mounted arrangements must meet project layout, ventilation, structural and fire-protection requirements. For multiple transformers, specify the quantity and capacity of each unit.

Developed by QuangAnhcons · © 2026 QuangAnhcons. Code licensed under GPL-2.0-or-later. Standards and manufacturer data belong to their respective owners.