The article provides detailed information on the electrical infrastructure at VSIP 1 industrial park, from management, bidding to current challenges in implementation and operation.
Information on the electrical infrastructure system at VSIP 1
The VSIP 1 industrial park has an electrical system designed to meet the industrial development needs. This system includes large substations and many 110kV electrical stations, ensuring continuous and stable power supply. To operate efficiently, the electrical system here is tightly monitored and managed to optimize usage efficiency and minimize incidents.
The VSIP I Binh Duong industrial park is a prime example of integrating advanced electrical infrastructure, ensuring stable power supply for industrial production. With direct connection to the national grid through intermediate stations of 110KV and 220KV, the total substation system here reaches a capacity of 141 MVA. This helps ensure a stable power supply for production activities, contributing to sustainable industrial development.
A highlight of the electrical system at VSIP I is the specialized electricity distribution system. Low-voltage substations are installed at each factory to optimize voltage adjustment capacity according to specific enterprise needs. The use of renewable energy is also emphasized with the implementation of rooftop solar power using technology from Sembcorp Industries of Singapore. This system not only helps reduce the load on the main grid but also optimizes performance management.
In terms of capacity, VSIP I once reached over 6.3 MW consumption for 6 major investors. The system is continuously upgraded to meet increasing demand, especially when the industrial park area is expanded to 1,000 ha. The ability to withstand difficult conditions such as flooding is also an advantage due to the ground elevation of 25 to 30m above sea level.
Supporting electrical infrastructure are auxiliary systems such as fire protection, communication via optical cable with bandwidth up to 2GB, and water supply reaching 40,000m³/day. These elements contribute significantly to maintaining continuous and efficient operation of the industrial park. All these factors have helped VSIP I maintain its competitive position by combining modern Singaporean technology and rich local resources.

Management units and the bidding process for the electrical system
The Binh Duong Power Company and industrial park electrical contractors of VSIP 1 are responsible for managing, operating, and bidding for projects related to the electrical system. The bidding process is conducted openly and transparently, ensuring the selection of top capable partners. Industrial park electrical contractors of VSIP 1 must meet high technical standards and comply with legal regulations on the construction and installation of electrical systems.
Management unit management bidding
One of the key units in managing the bidding process for the electrical system is the national bidding network system. This platform, operated by the Ministry of Planning and Investment (MPI), represents centralized bidding management in Vietnam. In particular, the Department of Bidding Management, a branch of the MPI, is responsible for supervising and appraising bidding documents to ensure fairness and transparency. In the field of electrical bidding, Vietnam Electricity (EVN) plays an important role in announcing plans for contractor selection and circulating information consistently with the national system. Thereby, EVN conducts electrical project bidding according to the Bidding Law 2023 and related guiding decrees.
Electrical system bidding process
- Registration and preparation: Contractors need to register an account on the national bidding network system at https://muasamcong.mpi.gov.vn, choosing between contractor or investor roles. Meanwhile, inviting parties such as EVN or related project units will upload detailed bidding package information, including invitations to bid and stringent technical requirements.
- Submitting bids: Contractors submit electronic bidding documents through this system, ensuring the use of legal digital signatures to confirm legal validity. Notably, in valid submissions, contractors need to comply with electronic bid security requirements if any, to enhance transparency in bidding management.
- Opening and evaluating bids: The bid opening process takes place online, and documents are publicly disclosed on the appointed day, allowing all relevant parties to monitor and evaluate. Evaluation criteria include bid price, technical capacity of the contractor, and past experience. These factors will be scrutinized by the bidding council or authorized unit.
- Presenting results and signing the contract: The contractor selection results will be submitted to authorities such as the investor or related ministries for approval. Next, results are publicly disclosed on the national bidding system, after which the contractor and inviting party proceed to sign electronic contracts via digital signatures.
Support tools and technology
The national-level online bidding system provides a comprehensive integrated solution, from information posting functions, bid submission, bid opening to electronic payment, ensuring transparency in the evaluation process. Additionally, mandatory use of digital signatures for both contractors and inviting parties provides an effective identity and legal verification mechanism in the bidding process for the electrical system.
Main legal basis
The legal basis for bidding activities includes Bidding Law 2023 and Decree No. 24/2024/ND-CP, providing detailed regulations and guidance on contractor selection through online means, using electronic contracts and electronic guarantees, thereby ensuring the transparency of the entire electrical bidding process.

Current challenges in managing and operating the electrical system
The electrical system at VSIP 1 is currently facing many challenges such as the rapid growth of industrial parks leading to overload at certain times. Industrial park electrical contractors of VSIP 1 must continuously optimize the system and apply new technologies to improve performance. These challenges require advanced technical solutions combined with effective management processes.
Managing and operating the electrical system at VSIP 1 is a complex task, especially when facing potential challenges in the context of strong industrialization.
Current power supply infrastructure
- Power supply: The system is supported by substations with a capacity of 141 MVA, directly connected to the national grid, meeting the basic needs of factories.
- Infrastructure: Includes stable power grid with medium voltage substations of 110KV and 220KV optimally arranged. However, maintaining stable infrastructure for industrial electricity requires continuous attention and appropriate adjustments.
Operational challenges
- Power loss: Is an important issue affecting economic efficiency. This loss can occur at substations and along transmission lines.
- High demand for electricity: The continuous development of industrial parks leads to greater electricity demand, requiring new power planning and upgrades to existing systems.
- Electrical system maintenance: Maintenance and management work needs to be carried out regularly to ensure the effective operation of substations and the entire system.
- Integration of renewable energy: Integrating renewable energy solutions such as solar or wind power faces technical barriers and requires new management demands.
- Safety and stability: The complexity of large industrial equipment requires a stable and safe plan for the electrical system.
- Long-term development planning: Planning needs to be designed to go one step ahead, ensuring demand growth is met.
Brands such as ABB, Mitsubishi, and Schneider provide the necessary technology to overcome some of these challenges. The combination of advanced technology and dedicated management can help overcome barriers in managing and operating the electrical system at VSIP 1.

Investing in electrical infrastructure at VSIP 1 industrial park brings many benefits and development opportunities for the local industry. However, the challenges in management and operation place demands on new technical and managerial strategies. Coordination between electrical contractors and management units is a key factor for success.
For consultation and cooperation with reputable construction units, contact QuangAnhcons via Hotline: +84 9 1975 8191.
QuangAnhcons provides design consulting and installation services for electrical systems for industrial parks, ensuring high-quality standards, meeting stable and continuous usage needs.