QUANGANHCONS · 22–35 kV NETWORKS · ROUTES · TERMINATIONS

Medium Voltage Lines & Underground Cables in Vietnam

Build a verifiable connection route from the supply point to the substation.

Network scopeProject-specific medium-voltage connections up to 35 kV
Route optionsOverhead, buried duct/trench, cable structures and defined crossings
Critical inputsUtility connection conditions, route drawings and land/access permissions

What this service covers

QuangAnhcons provides overhead and underground medium-voltage electrical works for factory connections, industrial facilities and defined network relocation packages in Vietnam. A complete proposal addresses the route, cable or conductor system, structures, joints, terminations, protection interfaces, testing and reinstatement responsibilities.

Discuss your project in English with our team. Our priority delivery area is Southern Vietnam; project location, access and mobilization are confirmed during quotation.

A defined scope from design to handover

Route assessment and design

Review survey data, connection location, existing utilities, cable entries, road crossings, access and future expansion. Compare feasible route options with civil and electrical interfaces clearly identified.

Overhead distribution works

Coordinate poles, structures, foundations, conductors, insulators, hardware, earthing and protection equipment against the approved design and the local network operator's requirements.

Underground cable installation

Define trench or duct construction, drainage, pulling arrangements, cable drums, route markers, joint locations, sealing and reinstatement. Assess specialist trenchless crossings separately.

RMU and termination interfaces

Coordinate voltage class, cable construction, connector interfaces, screening, bonding and accessory compatibility. Prepare acceptance checks and agreed testing before energization.

Engineering decisions that shape your project

Match cable voltage ratings to the actual system

The nominal network voltage alone is not enough to select a cable. Confirm U₀/U(Um), system earthing, fault duration and the project specification. The scope of IEC 60502-2 is not a blanket approval for every 35 kV network; the cable system and accessories must meet the applicable rated-voltage and utility requirements.

Thermal and fault performance

Cable ampacity depends on installation arrangement, soil thermal resistivity, depth, ducts, grouping and ambient conditions. Check short-circuit thermal duty and screen/earth-fault duty against the clearing time. Verify the intended bonding arrangement and the manufacturer's installation limits.

Measure installed length and purchase length separately

A hypothetical three-core cable route of 300 m, two 8 m risers and 8 m of measured bends/termination allowance requires 324 m before any stated procurement reserve. Three single-core cables covering the same route require three conductor lengths, or 972 m in that example. Drum planning, joint positions and actual geometry may change these quantities.

Constructability and testing

A route that fits on a plan may still fail cable-pulling limits. Check bending radii, pulling tension, sidewall pressure, duct occupancy and access to joint bays. Specify the inspection and electrical tests appropriate to the installed cable and accessories. Test method, voltage and duration are selected by the responsible engineer and equipment guidance, not copied from a generic checklist.

What belongs in the bill of quantities

Typical BOQ structure — final quantities follow the agreed design. Swipe horizontally on a narrow screen.
Work or material group Measurement basis What the offer should define
MV cable or overhead conductor m / phase / circuit Voltage class, construction and installed/purchase lengths
Cable joints and terminations Set / phase Compatible accessory type and interface rating
Poles, foundations and hardware Unit / set / m³ Approved structural and civil design
Ducts, trenches and joint bays m / unit / m³ Route sections, depth, reinstatement and crossings
Switching, protection and earthing Set / connection RMU, LBS or protection interfaces as designed
Testing, logistics and reinstatement Package Drum handling, access, witnesses and civil boundaries
Route length is only one cost driver. Cable type, soil conditions, surface reinstatement, road crossings, structures, joints, outages, traffic arrangements and access can materially change the price. Trenchless crossings, live-line works and exceptional civil conditions require separate assessment and an expressly agreed specialist scope.

From your brief to acceptance

  1. Confirm connection conditions and ownership boundaries.
  2. Review the route, constraints, permits and available survey information.
  3. Approve the electrical/civil design and coordinated cable schedule.
  4. Agree materials, drum lengths, installation method and inspection points.
  5. Complete construction, accessory installation and specified tests.
  6. Close records, coordinate authorized energization and deliver as-built route information.

Documents you should receive

  • Approved route and typical installation sections
  • Cable/conductor schedule and accessory register
  • Cable-pulling and installation method documentation
  • Material traceability and installation inspection records
  • Electrical test reports and network interface records
  • As-built route, joint locations, labels and handover dossier

The quotation identifies included documents, review cycles, approvals, acceptance criteria, exclusions and warranty obligations.

Frequently asked questions

Is underground installation always better than an overhead line?

No. Compare available corridors, network requirements, civil work, fault location/repair access, aesthetics, exposure and lifecycle cost. The preferred arrangement is project-specific.

Can an approximate route support a budget quotation?

Yes, provided route lengths and civil assumptions are stated. A firm offer needs the approved route, interface details and verified conditions affecting installation.

Are joints unavoidable?

No. Drum lengths and pulling sections can sometimes reduce them. The decision must also account for delivery logistics, permissible pulling loads, bends and future repair access.

Who authorizes energization?

Energization follows the responsible network operator's and asset owner's procedures. Construction completion alone does not authorize switching or connection.

Technical reference framework

Relevant engineering references are selected for the contracted equipment and installation. Applicable Vietnamese requirements, local network conditions, manufacturer instructions and the agreed design basis determine project compliance; listing a standard is not a certification claim.

    YOUR PROJECT · A CLEAR NEXT STEP

    Send the information needed for a useful quotation

    Start with the drawings and data you already have. We can identify what can be priced now and which points require verification.

    • Connection point and utility/network owner requirements
    • Nominal voltage, circuit capacity and fault data if available
    • Route plan with approximate overhead and underground lengths
    • Road crossings, existing utilities and access constraints
    • Substation/RMU cable entry and termination requirements
    • Required energization date and responsibility for permits/reinstatement

    Contact QuangAnhcons

    +84 919 758 191
    sales@quanganhcgte.com

    The email button opens your mail app with a service-specific brief. Attach drawings or share a viewable document link before sending.

    QUANGANHCONS · Electrical construction and energy integration in Vietnam.
    View all services · Content reviewed 18 October 2026.

    QUANGANHCONS · SOLAR EPC

    Chọn hệ Solar & lưu trữ cho công trình

    Từ nhu cầu sử dụng điện đến cấu hình và dự toán sơ bộ. Không cần thông tin liên hệ.

    Thông số kỹ thuật & phạm vi cung cấp

    Đã chọn sẵn cấu hình sơ bộ. Mở để điều chỉnh mái, thiết bị, đấu nối và tuyến cáp.

    Lưu trữ năng lượng BESS (tùy chọn)

    Dung lượng làm tròn theo bộ/tủ nguyên. Backup mặc định SOC 90% đến 10%, SOH 90%, hiệu suất xả 95%, giảm công suất 10%; xem và điều chỉnh qua trợ lý nếu có dữ liệu. Phần dự phòng được cộng tiền riêng, chưa phải xác nhận tương thích hoặc cam kết thời gian chuyển nguồn.

    Phạm vi và cơ sở dự toán

    Khối lượng và đơn giá sơ bộ theo cấu hình đã nhập; xác nhận lại sau khảo sát và thiết kế. Giá cơ sở có bộ rail, kẹp và chân liên kết pin thông thường trên kết cấu hiện hữu đủ điều kiện. Chọn giàn cao, móng, gia cường, BESS hoặc trạm mới để tính các hạng mục bổ sung.

    Cao độ mái tính từ mặt đất; độ nâng khung tính riêng từ mặt mái/sân. Diện tích và khoảng cách hàng pin là ước tính bố trí, chưa thay bản vẽ, kiểm tra tải gió, kết cấu, chống thấm và PCCC. VAT theo cấu hình báo giá, xác nhận theo hợp đồng/hóa đơn.

    Cụm tính toán tự động trước khảo sát

    Kết quả hiện ở đây khi nhập đủ dữ liệu: diện tích pin, phần phụ trợ, mái cần dùng, tải module, công suất và cấu hình điện.

    QUANGANHCONS

    Substation budget estimate

    Select the capacity, route lengths and package to view your indicative budget and electrical parameters.

    01   Quick estimate

    Cable and power-factor correction conditions
    Request a project quotation

    Send your project details, BOQ or drawings to request a formal quotation. Fields marked * are required.

    Reference quick estimate
    No quick estimate yet. You can still submit a project quotation request.

    Quotation scope

    Applies to one EVN-supplied substation with oil-immersed transformers at 22/0.4 kV (single-phase: 12.7/0.23 kV), with MV metering VTs/CTs supplied by EVN. The estimate includes the selected equipment, installation, earthing, transformer-to-main-breaker connections, design and connection documentation, and coordination of testing and utility acceptance.

    Kiosk, integrated steel-pole and indoor substations include MV switchgear and the entered underground cable route. Other outdoor arrangements use the relevant protection configuration. The final diagram must meet the project connection requirements.

    Excludes VAT, cables from the substation switchboard to the MSB/loads, live-line work, harmonic reactors, weak-ground treatment or special piling, land and special fire-protection provisions. Underground routes assume normal construction conditions and exclude road drilling and special reinstatement.

    Prices are indicative investment budgets. A formal quotation follows site assessment and agreement on the configuration. Electrical selections are preliminary and require design verification before installation.

    Capacity range and application conditions

    The catalogue defines the enquiry range of this tool, not universal TCVN capacity limits. Single pole-mounted transformers: 15–100 kVA; three-unit banks: 3×15–3×100 kVA. Platform substations: 100–630 kVA. Steel-pole substations: 100–630 kVA; 750/800 kVA require design verification and local approval. Ground-mounted, kiosk and indoor configurations: 50–10,000 kVA. Not every configuration has a package price or the same structural design.

    Reference: EVN Decision 1299/QD-EVN dated 3 November 2017, Volume 1, sections 3.3–3.4. Check the current requirements of the responsible utility before implementation. Kiosks must meet manufacturer ratings and testing requirements (IEC 62271-202); indoor and ground-mounted arrangements must meet project layout, ventilation, structural and fire-protection requirements. For multiple transformers, specify the quantity and capacity of each unit.

    Developed by QuangAnhcons · © 2026 QuangAnhcons. Code licensed under GPL-2.0-or-later. Standards and manufacturer data belong to their respective owners.