Project typesIndustrial roofs, commercial buildings, carports and defined ground-mounted electrical packages
Design boundaryPV DC circuits, inverters, AC distribution and the agreed point of connection
First decisionSize the system against demand, usable space and connection limits
What this service covers
QuangAnhcons provides solar electrical engineering, procurement and construction services for factories, warehouses and commercial facilities in Vietnam. Start with electricity consumption and usable roof area, compare a preliminary configuration, then confirm structural suitability, connection conditions and a project-specific bill of quantities.
Discuss your project in English with our team. Our priority delivery area is Southern Vietnam; project location, access and mobilization are confirmed during quotation.
A defined scope from design to handover
Feasibility and system design
Review bills and interval demand, shading, roof drawings, access, inverter locations and electrical capacity. Compare self-consumption, export-limited and storage-ready options against the actual operating pattern.
Procurement and construction
Agree module and inverter specifications, mounting design, cable schedules, protective devices, monitoring and installation methods. Coordinate structural and fire-safety work with the responsible specialists.
Grid and factory integration
Define the point of common coupling, metering, export control, transformer loading, protection interfaces and shutdown windows. Coordinate connection submissions where included in the contract.
Commissioning and handover
Inspect and test the installed system, demonstrate monitoring and alarms, document the as-built arrangement and train the operating team. Record outstanding items before acceptance.
Engineering decisions that shape your project
Capacity: separate kWp DC from kW AC
PV capacity in kWp is the sum of module nameplate ratings under standard test conditions. Inverter kW AC is the conversion capacity. Their ratio affects clipping and inverter utilization; it is not a fixed rule for every roof. Usable area must exclude access corridors, roof edges, skylights, equipment and shaded zones.
Energy and savings: use a transparent model
Annual energy can be screened as E = P_DC × Y_specific. In an illustrative case, 500 kWp × 1,400 kWh/kWp/year = 700,000 kWh/year. At an assumed 85% self-consumption ratio, 595,000 kWh/year offsets purchased electricity. These are assumptions, not a site yield forecast. Use a location-specific model and interval demand before an investment decision.
Returns: distinguish avoided purchases from export revenue
Calculate avoided electricity cost using the applicable time-of-use periods and the energy actually consumed on site. Deduct maintenance, replacement provisions and other operating costs. Evaluate export revenue only where the project has a confirmed legal and commercial route. Simple payback is capital cost divided by annual net savings; it does not replace a discounted cash-flow analysis.
Roof, protection and operational interfaces
Check remaining roof life, structural loads, wind uplift, corrosion, safe access and waterproofing before fixing the array. Electrical design checks include temperature-corrected string voltage, inverter operating limits, cable ampacity and voltage drop, isolation, bonding, surge protection and anti-islanding. Ordinary grid-connected PV does not provide outage backup without the required storage, controls and electrical separation.
What belongs in the bill of quantities
Typical BOQ structure — final quantities follow the agreed design. Swipe horizontally on a narrow screen.
Work or material group
Measurement basis
What the offer should define
PV modules
Module / kWp DC
Selected rating, quantity, layout and product warranty
Inverters and AC connection
Unit / set
AC rating, operating limits, protection and monitoring
Measured routes, installation method, supports and losses
Protection, earthing and monitoring
Set / point
Isolation, SPDs, metering, export control and communications
Installation and commissioning
Work package
Access equipment, tests, handover and agreed shutdowns
Price depends on access, roof condition, mounting loads, equipment specification, cable lengths, distribution upgrades and connection scope. Roof strengthening, major civil work, fire-safety modifications, export arrangements, taxes and battery storage must be individually identified. A price per kWp without these boundaries is not a complete EPC comparison.
From your brief to acceptance
Submit roof drawings, location, electricity bills and operating hours.
Review feasibility and compare capacity and connection options.
Verify the roof, electrical installation and access constraints on site.
Approve design, equipment, BOQ, exclusions and construction programme.
Install, inspect and complete the agreed electrical and monitoring tests.
Accept the system, receive operating documents and begin the warranty period.
Documents you should receive
Design basis, array layout and single-line diagram
Module/string schedule, inverter schedule and cable calculations
Itemized BOQ with supply, installation and optional works separated
Inspection and commissioning records with equipment identification
As-built drawings, monitoring access and operating instructions
Warranty schedule separating installation obligations from manufacturer terms
The quotation identifies included documents, review cycles, approvals, acceptance criteria, exclusions and warranty obligations.
Frequently asked questions
Can I obtain an initial estimate before a site survey?
Yes. Roof drawings, location, bills, connection information and an equipment brief can support a budget estimate. Structural suitability, actual routes and connection conditions remain subject to verification before a firm construction offer.
Does the solar calculator issue a final construction quotation?
No. It is a planning aid. Its capacity, energy, cost and schedule outputs depend on entered assumptions and available price data. The final offer follows engineering review and an agreed BOQ.
Can a battery be added later?
Potentially. Check inverter compatibility, AC/DC coupling, space, protection, communications and the operating objective at the initial design stage. Storage readiness does not mean every inverter can accept any battery.
What warranty applies?
Installation works can be quoted with a 12-month defects warranty from contractual acceptance. Module, inverter and battery manufacturer warranties are separate; their exclusions, labour coverage and claim process must be stated in the offer.
Technical reference framework
Relevant engineering references are selected for the contracted equipment and installation. Applicable Vietnamese requirements, local network conditions, manufacturer instructions and the agreed design basis determine project compliance; listing a standard is not a certification claim.
Use the planner below to compare an initial configuration. Review all assumptions, excluded works and price qualifications before using the result for a budget. Contact details are not needed to explore the calculation.
QUANGANHCONS · SOLAR EPC
Choose Solar & storage for your property
From electricity needs to a preliminary system and budget. No contact details required.
Automatic pre-survey calculations
Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.
QUANGANHCONS
Substation budget estimate
Select the capacity, route lengths and package to view your indicative budget and electrical parameters.
01 Quick estimate
Request a project quotation
Send your project details, BOQ or drawings to request a formal quotation. Fields marked * are required.
Quotation scope
Applies to one EVN-supplied substation with oil-immersed transformers at 22/0.4 kV (single-phase: 12.7/0.23 kV), with MV metering VTs/CTs supplied by EVN. The estimate includes the selected equipment, installation, earthing, transformer-to-main-breaker connections, design and connection documentation, and coordination of testing and utility acceptance.
Kiosk, integrated steel-pole and indoor substations include MV switchgear and the entered underground cable route. Other outdoor arrangements use the relevant protection configuration. The final diagram must meet the project connection requirements.
Excludes VAT, cables from the substation switchboard to the MSB/loads, live-line work, harmonic reactors, weak-ground treatment or special piling, land and special fire-protection provisions. Underground routes assume normal construction conditions and exclude road drilling and special reinstatement.
Prices are indicative investment budgets. A formal quotation follows site assessment and agreement on the configuration. Electrical selections are preliminary and require design verification before installation.
Capacity range and application conditions
The catalogue defines the enquiry range of this tool, not universal TCVN capacity limits. Single pole-mounted transformers: 15–100 kVA; three-unit banks: 3×15–3×100 kVA. Platform substations: 100–630 kVA. Steel-pole substations: 100–630 kVA; 750/800 kVA require design verification and local approval. Ground-mounted, kiosk and indoor configurations: 50–10,000 kVA. Not every configuration has a package price or the same structural design.
Reference: EVN Decision 1299/QD-EVN dated 3 November 2017, Volume 1, sections 3.3–3.4. Check the current requirements of the responsible utility before implementation. Kiosks must meet manufacturer ratings and testing requirements (IEC 62271-202); indoor and ground-mounted arrangements must meet project layout, ventilation, structural and fire-protection requirements. For multiple transformers, specify the quantity and capacity of each unit.